Micro Surfacing - CORRECT ANSWERS Rut Filler- Ruts up to 2 INCH
TYPE A- < 1/2 inches
TYPE B- 1/2 to 1 1/4 inches
PURPOSE:
-Improve surface friction
-Fill rods/minor surface irregularities
-Seal pavement surface
DESIGNED to be open to traffic within 1 hour of placement.
Temperature minimum of 50 Degrees
Apply from September 16 to April 30
DO NOT apply from October 1 to April 30
Module 4 page 54
Ultra Thin Wearing Course - CORRECT ANSWERS Three Types:
A- placed 0.5 inches thick- 45 to 65 lbs/yd^2
B- placed .75 inches thick- 55 to 80 lbs/yd^2
,NECEPT ASPHALT QUESTIONS AND ANSWERS UPDATED
2025/2026 A COMPLETE EXAM SOLUTION ALL
ANSWERS HAVE IT CORRECT VERIFIED GRADED A+ FOR
SUCCESS
C- placed .75 inches thick- 60 to 85 lbs/yd^2
Sublots - CORRECT ANSWERS Lowest number possible for subplots is 3
Longitudinal Joint Cores - CORRECT ANSWERS 5 sublots of 2,500 feet per
lot
Full lot = 12,500 linear feet
One sample from each lot
With vertical joints, cores centered on surface joint line
---Center of core to be within 1 inch of joint line
---Notch wedge joints to be centered 6 inches or half the wedge width
Cores taken from same lot are to be recorded on the same TR-447
Cores taken in different lots or cores taken >5 days, have to be recorded on a
separate TR-447 form
Document the date the material was PLACED
(Module 3)
, NECEPT ASPHALT QUESTIONS AND ANSWERS UPDATED
2025/2026 A COMPLETE EXAM SOLUTION ALL
ANSWERS HAVE IT CORRECT VERIFIED GRADED A+ FOR
SUCCESS
Asphalt Sampling Cores - CORRECT ANSWERS Subtract 1 foot from each
side of road/lane (Ex: 12-1-1=10ft)
If you run into a obstruction (Inlet, manhole) go another 1 foot from the edge of
obstruction
Store in safe, cool place and transport in a timely manner.
PTM #1
(Module 3)
Measuring Asphalt Thickness CONCRETE - CORRECT ANSWERS Average 4
measurements minimum 90 degree apart
Readings to the nearest 1/16 of a inch
Depth recorded to the nearest 1/8 of a inch
Normal lot defined as 2,500 tons with 5 subplots of 500 tons
---If Production is >500 and <2,500 then total quantity is divided into 5 sublots