nn nn nn nn nn
2025/2026 nn
nn
nn
Category nn1 nnnonfriable nnasbestos-containing nnmaterial nn(AMC) nn- nnCORRECT
nnANSWERmeans nnasbestos-containing nnpackages, nngaskets, nnresilient nnfloor nncovering,
nnand nnasphalt nnroofing nnproducts nncontaining nnmore nnthan nn1 nnpercent nnasbestos nnas
nndetermined nnusing nnthe nnmethod nnspecified nnin nnappendix nnE, nnsubpart nnE, nn40 nnCRF
nnpart nn763, nnsection nn1, nnPolarized nnLight nnMicroscopy nn
nn
Category nnII nnnonfiriable nnAMC nn- nnCORRECT nnANSWER-means nnany nnmaterial,
nnexcluding nnCategory nnI nnnonfirable nnAMC, nncontaining nnmore nnthan nn1 nnpercent
nnasbestos nnas nndetermined nnusing nnthe nnmethod nnspecified nnin nnappendix nnE, nnsubpart
nnE, nn40 nnCRF nnpart nn763, nnsection nn1, nnPolarized nnLight nnMicroscopy nnthat nn, nnwhen nndry,
nncannot nnbe nncrumbled, nnpulverized, nnor nnreduced nnto nnpowder nnby nnhand nnpressure nn
nn
Demolition nn- nnCORRECT nnANSWER-means nnthe nnwrecking nnof nntacking nnout nnof nnany
nnloadsupporting nnstructural nnmember nnof nna nnfacility nntogether nnwith nnany nnrelated
nnhandling nnoperations nnor nnthe nninternational nnburning nnof nnany nnfacility nn
nn
Friable nnasbestos nnmaterial nn- nnCORRECT nnANSWER-means nnany nnmaterial nncontaining
nnmore nnthan nn1 nnpercent nnasbestos nnas nndetermined nnusing nnthe nnmethod nnspecified nnin
nnappendix nnE, nnsubpart nnE, nn40 nnCRF nnpart nn763, nnsection nn1, nnPolarized nnLight
nnMicroscopy nnthat nn, nnwhen nndry, nncan nnbe nncrumbled, nnpulverized, nnor nnreduced nnto
nnpowder nnby nnhand nnpressure. nnIf nnthe nnasbestos nncontent nnis nnless nnthan nn10 nnpercent
nnas nndetermined nnby nna nnmethod nnother nnthan nnpoint nncounting nnby nnpolarized nnlight
nnmicroscopy nn(PLM), nnverify nnthe nnasbestos nncontent nnby nnpoint nncounting nnusing nnPLM. nn
nn
Regulated nnasbestos-containing nnmaterial nn(RAMC) nn- nnCORRECT nnANSWER-means
nn(a) nn
Friable nnasbestos nnmaterial, nn(b) nnCategory nnI nnnonfriable nnAMC nnthat nnhas nnbecome
nnfriable, nn(c) nnCategory nnI nnnonfirbale nnAMC nnthat nnwill nnbe nnor nnhas nnbeen nnsubjected nnto
nnsanding, nngrinding, nncutting, nnor nnabrading, nnor nn(d) nnCategory nnII nnNonfirable nnACM
nnthat nnhas nnbecome nncrumbled, nnpulverized, nnor nnrecorded, nnor nnreduced nnto nnpowder nnby
nnthe nnforces nnexpected nnto nnact nnon nnthe nnmaterial nnin nnthe nncourse nnof nndemolition nnor
nnrenovation nnoperations nnregulated nnby nnthis nnsubpart nn
nn
Renovations nn- nnCORRECT nnANSWER-means nnaltering nna nnfacility nnor nnone nnor nnmore
nnfacility nncomponents nnin nnany nnway, nnincluding nnthe nnstripping nnor nnremoval nnof nnRAMC
nnfrom nna nnfacility nncomponent. nnOperations nnin nnwhich nnload-supporting nnstructural
nnmembers nnare nnwrecked nnor nntaken nnout nnof nndemolitions. nn
nn
Visible nnemissions nn- nnCORRECT nnANSWER-means nnany nnemissions, nnwhich nnare
nnvisually nndetectable nnwith nnout nnthe nnhelp nnof nninstruments, nncoming nnform nnRAMC nnor
nnasbestos-containing nnwaste nnmaterial, nnor nnform nnany nnasbestos nnmilling,
nnmanufacturing, nnor nnfabricating nnoperations. nn
, This nndoes nnnot nninclude nncondensed, nnuncombined nnwater nnvapor nn
nn
61.145 nnStandard nnfor nndemolition nnand nnrenovation nn(a) nn1 nn(i) nn- nnCORRECT
nnANSWER-At nnleast nn
nn
80 nnlinear nnmeters nn(260 nnlinear nnfeet) nnon nnpipes nnor nnat nnleast nn15 nnsquare nnmeters
nn(160 nnsquare
nn
feet) nnon nnanother nnfacility
nncomponents
nn
61.145 nnStandard nnfor nndemolition nnand nnrenovation nn(a) nn1 nn(ii) nn- nnCORRECT
nnANSWER-At nnleast nn
1 nncubic nnmeter nn(35 nncubic nnfeet) nnoff nnfacility nncomponents nnwhere nnthe nnlength nnor
nnarea nncould nnnot
nn
be nnmeasured
nnpreviously
nn
Asbestos nncontaining nnmaterial nn(AMC) nn~ nnSchools nn- nnCORRECT nnANSWER-when
nnreferring nnto nn
nn
school nnbuildings nnmeans nnany nnmaterial nnor nnproduct nnwhich nncontains nnmore nnthan
nn1 nnpercent
nn
asbestos.
nn
Asbestos-containing nnbuilding nnmaterial nn(ACBM) nn~ nnSchools nn- nnCORRECT
nnANSWER-means nnsurfacing nnAMC, nnthermal nnsystem nninsulation, nnor nnmiscellaneous
nnAMC nnthat nnis nnfound nnin nnor nnon nninterior nnstructural nnmembers nnof nnother nnparts nnof nna
nnschool nnbuilding nn
nn
Functional nnSpace nn~ nnSchools nn- nnCORRECT nnANSWER-means nnany nnroom, nngroup
nnof nnrooms, nnor nnhomogeneous nnarea nn(including nncrawl nnspaces nnor nnthe nnspace
nnbetween nna nndropped nnceiling nnand nnthe nnfloor nnor nnroof nndeck nnabove), nnsuch nnas
nnclassroom(s), nna nncafeteria, nngymnasium, nnhallway(s), nndesignated nnby nna nnperson
nnaccredited nnto nnprepare nnmanagement nnplans, nndesign nnabatement nnprojects, nnor
nnconduct nnresponse nnactions nn
nn
Homogeneous nnarea nn- nnCORRECT nnANSWER-means nnany nnarea nnof nnsurfacing
nnmaterial, nnthermal nnsystems nninsulation nnmaterial, nnor nnmiscellaneous nnmaterial nnthat nnis
nnuniform nnin nncolor nnand nntexture nn
nn
Miscellaneous nnmaterial nn- nnCORRECT nnANSWER-means nninterior nnbuilding nnmaterial
nnon nnstructural nncomponents nnor nnfixtures, nnsuch nnas nnfloors nnand nnceiling nntiles, nnand
nndoes nnnot nninclude nnsurfacing nnmaterial nnor nnthermal nnsystem nninsulation nn
nn
Response nnaction nn- nnCORRECT nnANSWER-means nna nnmethod nnincluding nnremoval,
nnencapsulation, nnenclosure, nnrepair, nnoperations nnand nnmaintenance, nnthat nnprotects
nnhuman nnhealth nnand nnthe nnenvironment nnfrom nnfriable nnACMB nn
nn
Surfacing nnmaterial nn- nnCORRECT nnANSWER-means nnmaterial nnin nna nnschool nnbuilding
nnthat nnis nnspray-on, nntoweled-on, nnor nnotherwise nnapplied nnto nnsurfaces, nnsuch nnas