Software deteriorates due to... - ANSWER-Changes that degrade the code
structure, changes that degrade the design, changes that potentially incorporate
more bugs
What are the two broader categories of software products? - ANSWER-Generic
products, customized products
Which of the following is not a major software process activity? - ANSWER-
Software testing
During the lectures, we have discussed software engineering as a four layered
technology... which of the following belongs to the four layer technology? -
ANSWER-Quality, process, methods, tools
Which of the following is the UML modeling tool that is required we use in
CSE360 - ANSWER-Astah
According to the article "Software Engineering not CS", material cost of other
engineering products is about 50% compared to almost 100% labor cost in
COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 1
, software engineering. Due to the huge labor cost, software projects need to focus
more on... - ANSWER-Small team size, predictable delivery dates, short schedule
According to the article "Software Engineering not CS", a well-run software
project can be managed to meet which of the following product goals? -
ANSWER-Good maintainability, minimal defects, maintain a cohesive team
(T/F) Pair programming invented in XP promotes faster coding as two people are
programming the same module - ANSWER-False
(T/F) User stories in XP are developed by project managers - ANSWER-False
(T/F) In XP, new versions may be built several times per day... - ANSWER-True
(T/F) Scrums are daily meetings in the scrum process model - ANSWER-True
Which of the following are software main process activities? - ANSWER-
Specification, Design and implementation
Which of the following statements is true about plan driven software process
models? - ANSWER-all of the process activities are planned in-advanced and
progress is measured against this plan, incremental process model is an example of
a plan driven approach
Consider the following software project requirement and then select the best
process model to develop this software...
COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 2
QUESTIONS AND ANSWERS
Software deteriorates due to... - ANSWER-Changes that degrade the code
structure, changes that degrade the design, changes that potentially incorporate
more bugs
What are the two broader categories of software products? - ANSWER-Generic
products, customized products
Which of the following is not a major software process activity? - ANSWER-
Software testing
During the lectures, we have discussed software engineering as a four layered
technology... which of the following belongs to the four layer technology? -
ANSWER-Quality, process, methods, tools
Which of the following is the UML modeling tool that is required we use in
CSE360 - ANSWER-Astah
According to the article "Software Engineering not CS", material cost of other
engineering products is about 50% compared to almost 100% labor cost in
COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 1
, software engineering. Due to the huge labor cost, software projects need to focus
more on... - ANSWER-Small team size, predictable delivery dates, short schedule
According to the article "Software Engineering not CS", a well-run software
project can be managed to meet which of the following product goals? -
ANSWER-Good maintainability, minimal defects, maintain a cohesive team
(T/F) Pair programming invented in XP promotes faster coding as two people are
programming the same module - ANSWER-False
(T/F) User stories in XP are developed by project managers - ANSWER-False
(T/F) In XP, new versions may be built several times per day... - ANSWER-True
(T/F) Scrums are daily meetings in the scrum process model - ANSWER-True
Which of the following are software main process activities? - ANSWER-
Specification, Design and implementation
Which of the following statements is true about plan driven software process
models? - ANSWER-all of the process activities are planned in-advanced and
progress is measured against this plan, incremental process model is an example of
a plan driven approach
Consider the following software project requirement and then select the best
process model to develop this software...
COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 2