Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 69 pages
Exam (elaborations)

TEXAS WASTEWATER CLASS A Exam | Comprehensive Q&A For Certification Success 2025/2026

Document preview thumbnail
Preview 4 out of 69 pages

TEXAS WASTEWATER CLASS A Exam | Comprehensive Q&A For Certification Success 2025/2026

Content preview

1|Page


TEXAS WASTEWATER CLASS A Exam |
Comprehensive Q&A For Certification Success
2025/2026


Seeding of BOD samples is necessary when samples -correct-answer-(All of the
above) have a chlorine residual, have a previously been chlorinated, have been
subjected to high temperatures, contain high or low pH industrial wastes




When is blue-green algae the most dominant on a pond treatment system? -
correct-answer-Summer




Before making major changes in the collection system or the treatment plant,
detailed designed by a professional engineer must be submitted to TCEQ before -
correct-answer-beginning construction




When connecting a public water supply to any source of potential contamination,
an air gap of what size must be provided? -correct-answer-two times the inlet pipe
diameter

,2|Page


The most important purpose for wastewater treatment is -correct-answer-to
remove harmful contaminants from the wastewater before it is discharged to the
waters of the state




Septic wastewater has what properties? -correct-answer-a. dark in color b.
offensive odor e. Jacks dissolved oxygen d. is harder treat than fresh wastewater
e. all of the above




One of the requirements of the Texas Hazard Communication Act of 1985 is that
the employer must hold annual training in which the utilities' written policies and
the employee's rights are explained to -correct-answer-all employees




The Federal Clean Water Act -correct-answer-requires a permit for disposal of
sludge requires a permit for ocean discharges of sewer c. requires a permit for
disposal or placement of dredge material creates a national permit system for all
wastewater discharge




Pretreatment of industrial waste will help minimize -correct-answer-sludge
contamination interference to the treatment process safety hazards to workers
discharge of industrial pollutants in the effluent

,3|Page


If an employee is guilty of misconduct as defined by the utilities personnel
policies, the supervisor should -correct-answer-attempt to modify the employee's
behavior through training and other forms of assistance inform the employee of
the consequences if the behavior is not modified




When fighting an electrical fire, you should -correct-answer-Use non-conductive
extinguishing methods c. Use Class A or B extinguishers if electricity to the unit
has been shut-off d. Either b or e




A particular construction project has a total of 3,000 feet of 12-inch pipe, 15
manholes, 50 wastewater connections. Based upon the contract unit costs shown,
if the contractor has completed 2,000 feet of pipe, 12 manholes, and 30
wastewater connections, what percentage of the total project has been
completed?


12 inch pipe place $85.00 per linear foot
Manholes in place $1,500.00 each
Wastewater connections $250.00 each -correct-answer-3000 x 85 = 255,000
15 x1500 = 22,500
50x 250 = 12,500
255,000 + 22,500+ 12,500 = $290,000
2000 x 85 = 170,000
12x1500 - 18,000
30x250 =7,500

, 4|Page


170,000 + 18,000 + 7,500 = S195,500
195,000/290000 =0.67 = 67%




If the float that turns on the lead pump in a wastewater lift station is situated
above a gravity influent line, the line will -correct-answer-tend to have a grease
problem




If an operations company ceases its operation or is sold such that control of the
company is transferred to another party, -correct-answer-the company's
operations certificate is revoked




In 2.5 minutes, a lift station will fill up 18" with no pumps running. In 3.25
minutes, both pumps will drop the level in the lift station 18". In 7 minutes, the
large pump will drop the level 18". What is the capacity of the small pump? The
lift station is 10' x 10 x 10'.


10x10x1.5x7.48=1122
1122 gal/2.5=449 gpm inflow


Both
1122/3.25=345 gpm + 449 gpm = 794 gpm both

Document information

Uploaded on
August 16, 2025
Number of pages
69
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DRVERITY
3.8
(13)
Sold
111
Followers
0
Items
8684
Last sold
5 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions