• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 33 pages
Exam (elaborations)

2025 Latest update IPC Flashcards questions well answered graded A+ updated

Document preview thumbnail
Preview 4 out of 33 pages

2025 Latest update IPC Flashcards questions well answered graded A+ updated

Content preview

2025 Latest update IPC Flashcards
questions well answered graded A+
updated

The purpose of this code is to establish _____ standards to provide a reasonable level of safety,
health, property protection, and public welfare. - correct answer ✔✔minimum

(By regulating and controlling the design, construction, installation, quality of materials,
location, operation, and maintenance or use of plumbing equipment and systems.)

Sec. 101.3



Where, in any specific case, different sections of this code specify different materials, methods
of construction, or other requirements, the most _____ shall govern. - correct answer
✔✔restrictive

(Where there is a conflict between a general requirement and a specific requirement, the
specific requirement shall govern.)

Sec. 102.1



Minor plumbing repairs may be done in the same manner and arrangement as was in the
existing system as long as it is not hazardous and is _____. - correct answer ✔✔approved

Sec. 102.4



Where the extent of a referenced standard includes subject matter that is within the scope of
the IPC, the provisions of _____ shall take precedence over the provisions in the referenced
standard. - correct answer ✔✔the IPC

Sec. 102.8.2

,Where there are practical difficulties involved in carrying out the provisions of this code, the
code official shall have the authority to grant _____ for individual cases. - correct answer
✔✔modifications

(Provided that special individual reason makes the strict letter of the code impractical; the
modification conforms to the intent and purpose of the code; and it does not lessen the safety
requirements of the code.)

Sec. 105.1



Where the code official finds that a proposed alternative material does not comply with the
intent of the code provisions, the code official shall respond _____, stating the _____. - correct
answer ✔✔in writing

reason for disapproval

Sec. 105.2



How many extensions of 180 days may a code official grant on an application for a permit? -
correct answer ✔✔One or more

(Notice an issued permit can only be extended once per Sec. 106.5.4)

Sec. 106.3.3



No permit presuming to give authority to violate or cancel the provisions of this code shall be
_____. - correct answer ✔✔valid

(The issuance of a permit shall not be a permit for, or an approval of, any violation of any
provision of the code or any other ordinance.)

Sec. 106.5.2



Underground inspection shall be made after trenches or ditches are excavated and bedded,
piping installed, and before any _____ is put in place. - correct answer ✔✔backfill

Sec. 107.2, Item 1

,Rough-in inspection shall be made after the roof, framing, fireblocking, firestopping,
draftstopping, and bracing is in place and all sanitary, storm, and water distribution piping is
roughed-in, and prior to the installation of _____ or _____ membranes. - correct answer
✔✔wall

ceiling

Sec. 107.2, Item 2



Final inspection shall be made after the building is complete, all plumbing fixtures are in place
and properly connected, and the structure is ready for _____. - correct answer ✔✔occupancy

Sec. 107.2, Item 3



The code official shall have the authority to authorize _____ of utility service to the building,
structure, or system regulated by the technical codes in case of emergency, where necessary, to
eliminate an immediate danger to or property. - correct answer ✔✔disconnection

Sec. 108.7.2



A permit for temporary equipment, systems and uses shall be limited as to time of service, but
shall not be permitted for more than _____ days. - correct answer ✔✔180

Sec. 110.1



One-way valve designed to allow air to enter the plumbing drainage system when negative
pressures develop in the piping system. - correct answer ✔✔Air Admittance Valve

(Review the rest of this definition.)

Sec. 202



The unobstructed vertical distance through the free atmosphere between the outlet of the
waste pipe and the flood level rim of the receptacle into which the waste pipe is discharging. -
correct answer ✔✔Air Gap (Drainage System)

Sec. 202

, A receptacle designed to collect surface or storm water from an open area. - correct answer
✔✔Area Drain

Sec. 202



A backflow prevention assembly, a backflow prevention device, or other means or method to
prevent backflow into the potable water supply. - correct answer ✔✔Backflow Preventer

(Review the different Backflow definitions.)

Sec. 202



A group of fixtures consisting of a water closet, lavatory, bathtub, or shower, including or
excluding a bidet, an emergency floor drain or both. - correct answer ✔✔Bathroom Group

(Such fixtures are located together on the same floor level.)

Sec. 202



Any part of the piping system except a riser, main, or stack. - correct answer ✔✔Branch

Sec. 202



The part of the lowest piping of a drainage system that receives the discharge from soil, waste,
and other drainage pipes inside and that extends 30 inches beyond the exterior walls of the
building and conveys the drainage to the building sewer. - correct answer ✔✔Building Drain

(Review the different types of building drains.)

Sec. 202



An access opening in the drainage systems utilized for the removal of obstructions. - correct
answer ✔✔Clearout

Sec. 202

Document information

Uploaded on
August 12, 2025
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$24.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BukayoSaka120
3.7
(33)
Sold
112
Followers
72
Items
6099
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions