• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

SWM DEQ Exam 150 Questions & Answers (2025/2026) [100% Verified Answers A+].

Document preview thumbnail
Preview 2 out of 11 pages

This document contains 150 real questions with 100% verified correct answers for the SWM DEQ (Solid Waste Management – Department of Environmental Quality) Exam, updated for the 2025–2026 cycle. It covers core topics such as waste classification, disposal methods, recycling processes, environmental regulations, safety procedures, and compliance requirements. Graded A+, this resource is designed to provide accurate and complete preparation for passing the SWM DEQ certification exam.

Content preview

SWM DEQ Exam 150 Questions &
Answers (2025/2026) [100% Verified
Answers A+].

The Virginia Stormwater Management Program is authorized by the ______ and administered
through the ______ - CORRECT ANSWER-Virginia Stormwater Management Act, Virginia
Stormwater Management Program Regulation



VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that
are - CORRECT ANSWER-greater than or equal to an acre



The Stormwater Management Act requires the State Water Control Board to - CORRECT
ANSWER-permit, regulate, and control stormwater runoff


DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts upon request -
CORRECT ANSWER-90


The Stormwater Management Act requires the following individuals to obtain and maintain a
certificate of competency - CORRECT ANSWER-staff of a stormwater program, anyone
contracted by a VSMP authority, standard and specification holders



The dual certificate will expire three years from - CORRECT ANSWER-the latest date of the
certificates



SWM plan must be approved by ___ before land disturbance - CORRECT ANSWER-VSMP
program authority



The water quality criteria sets a site-based load limit of ____ of total phosphorus for new
development - CORRECT ANSWER-0.41 lbs/acre/year

, The phosphorus load limit uses the - CORRECT ANSWER-10% impervious cover



Part II B and II C water quantity criteria addresses - CORRECT ANSWER-channel protection and
flood protection



Which two plans in the SWPPP must be approved? - CORRECT ANSWER-SWM plan, ESC plan



Does the SWM plan address runoff during or after construction? - CORRECT ANSWER-post-
construction



What is the lower limit of the range of imperviousness that can result in stream degradation? -
CORRECT ANSWER-10%


What do land disturbing activities consist of? - CORRECT ANSWER-excavating, clearing, grading



LDA threshold for the SWM Act and Regulation - CORRECT ANSWER-1 acre or 2500 square feet
for Chesapeake Bay Preservation Act



In situations where an initial exemption was applicable because LDAs were related to emergency
work, VSMP authority shall be advised of the disturbance within - CORRECT ANSWER-7 days of
commencing the LDA and shall submit a permit application within 30 days of starting the land-
disturbing activity



Localities with MS4 - CORRECT ANSWER-must adopt and administer a stormwater program



Localities without MS4 - CORRECT ANSWER-may choose to administer a VSMP or have DEQ
administer the program



DEQ is responsible for enforcing the ____ while locality ____ are responsible for enforcing local
ordinances - CORRECT ANSWER-Construction GP, VSMP

Document information

Uploaded on
August 11, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.99
Purchased by 0 students

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
JAYDEN254
5.0
(4224)
Sold
335
Followers
21
Items
3003
Last sold
21 hours ago

Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions