Basics covered in Level 1 Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? 6" of compacted depth at full width In Earthwork what is a Lot? A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for Done for base, sub grade, and embankment. Sampling is determined how generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway Minimum of three representative sample combined. What is LIMS? Laboratory Info Management System The proctor theory is when compaction is achieved how by inputting energy to expel air and water in the soil voids Compaction causes An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and creates what In a laboratory and establishes a density standard to be used on the roadway Lab proctors are created how Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. 8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet used in It is used in embankment and structure back fill materials Standard proctors are created how With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total Comparison between VT and QC density test tolerance 2 lbs/pcf What is the STRG Sampling, Testing, and Reporting Guide (state wide) A job guide schedule is project specific The material identification number for embankment in the laboratory is 004L The material identification number for embankment in the field is 004F The material identification number for base is 030 PP is short for project personel Sampling in the field it is important to sample each type of material and have enough for a representative sample When to secure samples After material is placed but before compaction effort is applied Sample transmittal card the source uses what code for the jobsite 08 For material description the minimum is always Color and texture On sample bags be sure to put Project # Sample # Location 8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet itemizes the minimum requirements for sampling and testing? Sampling, testing, reporting guide Unit weight is the weight of a material occupying a volume

Show more Read less
Institution
FDOT Earthwork Level 1
Course
FDOT Earthwork Level 1









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT Earthwork Level 1
Course
FDOT Earthwork Level 1

Document information

Uploaded on
August 8, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet




FDOT Earthwork Level 1

Save




Practice questions for this set


Learn 1 /7 Study with Learn




Earthwork is the excavation and placement of soils and materials supporting
the proposed roadway.



Choose an answer



Earthwork has to do with the
1 Sampling at the roadway is done for 2
roadway in what way?



3 Graph plot and counting lifts 4 If the speedy gets hot



Don't know?




Terms in this set (93)




https://quizlet.com/1064557332/fdot-earthwork-level-1-flash-cards/?new 1/9

, 8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet



Nuclear Testing
Basics covered in Level 1 Speedy Moisture
Report Forms

Earthwork has to do with Earthwork is the excavation and placement of soils
the roadway in what way? and materials supporting the proposed roadway.

In Earthwork what is a lift? 6" of compacted depth at full width

A lot is 1 lift at 500 ft or within compacted area.
In Earthwork what is a Lot?
Isolated compaction operations are separate lots.

Sampling at the roadway Done for base, sub grade, and embankment.
is done for

Sampling is determined generated with random numbers usually by a
how Verification Inspector

What is important about Minimum of three representative sample combined.
sampling at the roadway

What is LIMS? Laboratory Info Management System

The proctor theory is by inputting energy to expel air and water in the soil
when compaction is voids
achieved how

An increase in unit weight, decrease in compressibility
Compaction causes
and permeability.

The proctor is determined In a laboratory and establishes a density standard to
where and creates what be used on the roadway

Material is gathered from the road and prepared with
Lab proctors are created
different amounts of water then placed in molds and
how
hammered

What is a modified proctor It is used in base, sub grade, MSE wall back fill
used in materials

Modified proctors are With a 10lb hammer(rammer) on a 18" drop with 56
created how blows per layers with 5 layers in total.



https://quizlet.com/1064557332/fdot-earthwork-level-1-flash-cards/?new 2/9
$13.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
quizletquizizzy

Get to know the seller

Seller avatar
quizletquizizzy Cambridge Institute Of Allied Health & Technology
View profile
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
1 year
Number of followers
0
Documents
517
Last sold
2 weeks ago
latest papers

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions