FDOT Final Estimates - Level 1
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Field Notebooks
Choose an answer
Which Document contains a series of Specially designed forms that show both original
1
estimates of quantities and the final quantities as measured ad accepted?
When is it permissible to record only the net weight on an asphaltic concrete tabulation
2
form?
Where are major changes during construction documented and "as-built" conditions
3
shown?
In case of discrepancies among the contract documents, which document takes the
4
highest precedence?
https://quizlet.com/1064556715/fdot-final-estimates-level-1-flash-cards/?new 1/9
, 8/8/25, 8:33 AM FDOT Final Estimates - Level 1 Flashcards | Quizlet
Don't know?
Terms in this set (50)
What two types of Final & Progress Monthly
Estimates are needed to
pay for the work
performed by
contractors?
In case of discrepancies Special Provisions
among the contract
documents, which
document takes the
highest precedence?
Contractors Recieve Monthly Progress Estimates
progress payments on the
basis of?
Which of the following Preparation and Documentation Manual (PDM)
sets forth the
Department's methods
and procedures for
preparing and checking
final estimates?
Which Document contains Computation Books
a series of Specially
designed forms that show
both original estimates of
quantities and the final
quantities as measured ad
accepted?