Walmart - Stormwater Exam [ACTUAL
EXAM] LATEST VERSION
[QUESTIONS AND ANSWERS] WITH
PRACTICE EXAM DETAILED AND
VERIFIED FOR GUARANTEED PASS-
LATEST UPDATE 2025 GRADED A
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - CORRECT ANSWER NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? - CORRECT ANSWER Discharge from contaminated groundwater
The Notice of termination can filed when: - CORRECT ANSWER All construction
activity, inside and outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: - CORRECT ANSWER Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater - CORRECT ANSWER Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: - CORRECT ANSWER Groundcover
Temporary stabilization should be implemented - CORRECT ANSWER
Immediately on all disturbed areas that are likely to or will remain inactive for 14-days or
more
The Primary purpose of a construction exit is - CORRECT ANSWER To remove
sediment from construction site vehicles and minimize trackout
Common types of erosion include all of the following except - CORRECT ANSWER
Sedimentation
EXAM] LATEST VERSION
[QUESTIONS AND ANSWERS] WITH
PRACTICE EXAM DETAILED AND
VERIFIED FOR GUARANTEED PASS-
LATEST UPDATE 2025 GRADED A
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - CORRECT ANSWER NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? - CORRECT ANSWER Discharge from contaminated groundwater
The Notice of termination can filed when: - CORRECT ANSWER All construction
activity, inside and outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: - CORRECT ANSWER Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater - CORRECT ANSWER Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: - CORRECT ANSWER Groundcover
Temporary stabilization should be implemented - CORRECT ANSWER
Immediately on all disturbed areas that are likely to or will remain inactive for 14-days or
more
The Primary purpose of a construction exit is - CORRECT ANSWER To remove
sediment from construction site vehicles and minimize trackout
Common types of erosion include all of the following except - CORRECT ANSWER
Sedimentation