• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 22 pages
Exam (elaborations)

NERC Prep - Bal, Int, & Trans Exam Questions and Answers

Document preview thumbnail
Preview 3 out of 22 pages

NERC Prep - Bal, Int, & Trans Exam Questions and AnswersNERC Prep - Bal, Int, & Trans Exam Questions and AnswersNERC Prep - Bal, Int, & Trans Exam Questions and Answers

Content preview

NERC Prep - Bal, Int, & Trans Exam Questions and Answers



b.NERC OperatingCommittee -What group canapprove achangeinthe Disturbance
x x x x x x x x x x x x x




x Recovery Period for an Interconnection? x x x x




a. NERCInterconnectionWorkingGroup x x x




b. NERCOperatingCommittee x x




c. NERCRegionalCouncil x x




d. NERCDisturbanceAnalysisWorkingGroup x x x x




c. Checktargets andequipment -What isthefirst thing anoperator shoulddo after a relay
x x x x x x x x x x x x x x x x x




x operation?
a. Checkpowersystemstabilizers x x x




b. NotifyadjacentTransmission andBalancing areas
x x x x x




c. Checktargetsandequipment x x x




d. Notifytheir PSE thatthe transmission pathisoutof service
x x x x x x x x x x




c. TieLines-For theACE equationto work properly, dynamic schedules, pseudo ties,
x x x x x x x x x x x x x x




x frequency calculations, and all x x x x must be metered. x x




a. Communications
b. Transformers
c. TieLines x




d. Generation


c. EnergyEmergencyAlertLevel I -WhatEnergyAlert Level would the following
x x x x x x x x x x x x x




x example be categorized as? x x x




"ABalancing Authority, ReserveSharingGroup, orLoad ServingEntityforesees, or is
x x x x x x x x x x x x




x experiencing conditions where all available resources are committed to meet firm load,
x x x x x x x x x x x




x firm transactions, etc, and requests an Energy Emergency Alert."
x x x x x x x x

, a. EnergyEmergencyAlert Level IV x x x x




b. EnergyEmergencyAlertLevelIII x x x x




c. EnergyEmergencyAlert Level I x x x x




d. EnergyEmergencyAlertLevelII x x x x




b. Implement the appropriate congestion management procedure. - You are a Reliability
x x x x x x x x x x x




x Coordinator in the Eastern Interconnection. A flow gate has become overloaded because
x x x x x x x x x x x




aparallel345kV linehas relayed outand part ofthatload has transferred over to the flow
x x x x x x x x x x x x x x x x x x




x gate causing an SOL and possible IROL violation. What would you do to relieve this
x x x x x x x x x x x x x x




x violation?
a. NotifyanotherReliabilityCoordinatorand ask themif theyare having any
x x x x x x x x x x x




x problem, and what should you do. x x x x x




b. Implementtheappropriatecongestion managementprocedure. x x x x x




c. IssueaTransmission warningto theTransmission Operators thatlostthe345kV line.
x x x x x x x x x x x x




d. Placethe line backin servicewithin 30 minutes.
x x x x x x x x




b.AdjacentBalancing Authorities -Interchangeschedulesmaybeimplemented
x x x x x x x x x




x between x .
a. SourceandSinkBalancing Authorities x x x x




b. AdjacentBalancingAuthorities x x




c. Sending,ReceivingandIntermediate Balancing AuthoritiesinthesameRegion.
x x x x x x x x x




d. BalancingAuthoritiesinthesameInterconnection. x x x x x




a. Frequencywillcontinue to drop,generatorgovernorresponse,decreaseinload. x x x x x x x x x x




- When the frequency of an Interconnection decreases due to the loss of a large
x x x x x x x x x x x x x x




x generator, the x x until the combination of bothx x x x x




x and x replace the output of the lost generator. x x x x x x

, a. Frequencywill continuetodrop,generatorgovernor response, decrease inload x x x x x x x x x x




b. Frequencywillcontinuetodrop,generatorgovernor response, voltage x x x x x x x x




x regulating transformer response x x




c. Voltagewill continue toraise,generatorAVRresponse,voltageregulating
x x x x x x x x x




x transformer response x




d. Voltagewill continue toraise,generatorAVRresponse,decreasein load
x x x x x x x x x x




a. That all involved reliability entities determined that there is no reliability
x x x x x x x x x x




x problems with the Arranged Interchange. - In developing and setting up an
x x x x x x x x x x x




x ArrangedInterchange,which ofthefollowing wouldtransition theArranged
x x x x x x x x x




x Interchange to the Confirmed Interchange status? x x x x x




a. Thatallinvolved reliabilityentitiesdetermined thatthereisnoreliability
x x x x x x x x x x




x problems with the Arranged Interchange. x x x x




b. TheDepartment ofEnergy(DOE)made anin-depth studyofthe Interchange
x x x x x x x x x x x




x Agreement and determined that it would have an adverse affect on the
x x x x x x x x x x x




x Interconnection.
c. There areavailable resourcesto meet theload.
x x x x x x x




d. Allparties involved realizedthattheywould notlosemoneyfor theircompany with
x x x x x x x x x x x x x




x this Interchange Agreement.
x x




b. He violated NERCstandards - Early in the afternoon, a systemoperatornotices that
x x x x x x x x x x x x x




frequencyhas dropped to 59.95Hzand hisbalancing area'sACE is0. Inorder to correct
x x x x x x x x x x x x x x x x




x the under frequency condition, the operator pulses his generators to increase
x x x x x x x x x x




x generation. Which statement best describes his actions? x x x x x x




a. HefollowedNERCguidelines
x x x




b. Heviolated NERC standards
x x x




c. Hehelpedthe system
x x x




d. Hehasnotimpacted the system
x x x x x

Document information

Uploaded on
August 5, 2025
Number of pages
22
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
47
Followers
4
Items
1167
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions