• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 22 pages
Exam (elaborations)

NERC Prep - Bal, Int, & Trans Exam Questions and Answers

Document preview thumbnail
Preview 3 out of 22 pages

NERC Prep - Bal, Int, & Trans Exam Questions and AnswersNERC Prep - Bal, Int, & Trans Exam Questions and AnswersNERC Prep - Bal, Int, & Trans Exam Questions and Answers

Content preview

NERC Prep - Bal, Int, & Trans Exam Questions and Answers

b. NERC Operating Committee - What group can approve a change
L L L L L L L L L L




in the Disturbance Recovery Period for an Interconnection?
L L L L L L L L




a. NERC Interconnection Working GroupL L L




b. NERC Operating Committee L L




c. NERC Regional Council L L




d. NERC Disturbance Analysis Working Group
L L L L




c. Check targets and equipment - What is the first thing an operator should do after a
L L L L L L L L L L L L L L L L




relay operation?
L L




a. Check power system stabilizersL L L




b. Notify adjacent Transmission and Balancing areas
L L L L L




c. Check targets and equipment L L L




d. Notify their PSE that the transmission path is out of service
L L L L L L L L L L




c. Tie Lines - For the ACE equation to work properly, dynamic schedules, pseudo ties,
L L L L L L L L L L L L L L




frequency calculations, and all
L L L L L must be metered. L L




a. Communications
b. Transformers
c. Tie Lines L




d. Generation


c. Energy Emergency Alert Level I - What Energy Alert Level would the following
L L L L L L L L L L L L L




example be categorized as?
L L L L




"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is
L L L L L L L L L L L L




experiencing conditions where all available resources are committed to meet firm
L L L L L L L L L L L




load, firm transactions, etc, and requests an Energy Emergency Alert."
L L L L L L L L L L

, a. Energy Emergency Alert Level IV L L L L




b. Energy Emergency Alert Level III L L L L




c. Energy Emergency Alert Level I L L L L




d. Energy Emergency Alert Level II L L L L




b. Implement the appropriate congestion management procedure. - You are a
L L L L L L L L L L




Reliability Coordinator in the Eastern Interconnection. A flow gate has become
L L L L L L L L L L L




overloaded because a parallel 345kV line has relayed out and part of that load has
L L L L L L L L L L L L L L L




transferred over to the flow gate causing an SOL and possible IROL violation. What
L L L L L L L L L L L L L L




would you do to relieve this violation?
L L L L L L L




a. Notify another Reliability Coordinator and ask them if they are having any
L L L L L L L L L L L




problem, and what should you do.
L L L L L L




b. Implement the appropriate congestion management procedure. L L L L L




c. Issue a Transmission warning to the Transmission Operators that lost the 345kV
L L L L L L L L L L L




line.
L




d. Place the line back in service within 30 minutes.
L L L L L L L L




b. Adjacent Balancing Authorities - Interchange schedules may be implemented
L L L L L L L L L




between
L L .
a. Source and Sink Balancing Authorities
L L L L




b. Adjacent Balancing Authorities L L




c. Sending, Receiving and Intermediate Balancing Authorities in the same Region.
L L L L L L L L L




d. Balancing Authorities in the same Interconnection. L L L L L




a. Frequency will continue to drop, generator governor response, decrease in load.
L L L L L L L L L L




- When the frequency of an Interconnection decreases due to the loss of a large
L L L L L L L L L L L L L L




generator, the
L L L until the combination of both
L L L L L




and
L L replace the output of the lost generator. L L L L L L

, a. Frequency will continue to drop, generator governor response, decrease in load
L L L L L L L L L L




b. Frequency will continue to drop, generator governor response, voltage
L L L L L L L L




regulating transformer response
L L L




c. Voltage will continue to raise, generator AVR response, voltage regulating
L L L L L L L L L




transformer response
L L




d. Voltage will continue to raise, generator AVR response, decrease in load
L L L L L L L L L L




a. That all involved reliability entities determined that there is no reliability
L L L L L L L L L L




problems with the Arranged Interchange. - In developing and setting up an
L L L L L L L L L L L L




Arranged Interchange, which of the following would transition the Arranged
L L L L L L L L L L




Interchange to the Confirmed Interchange status?
L L L L L L




a. That all involved reliability entities determined that there is no reliability
L L L L L L L L L L




problems with the Arranged Interchange.
L L L L L




b. The Department of Energy (DOE) made an in-depth study of the Interchange
L L L L L L L L L L L




Agreement and determined that it would have an adverse affect on the
L L L L L L L L L L L L




Interconnection.
L




c. There are available resources to meet the load.
L L L L L L L




d. All parties involved realized that they would not lose money for their company
L L L L L L L L L L L L




with this Interchange Agreement.
L L L L




b. He violated NERC standards - Early in the afternoon, a system operator notices that
L L L L L L L L L L L L L




frequency has dropped to 59.95Hz and his balancing area's ACE is 0. In order to
L L L L L L L L L L L L L L L




correct the under frequency condition, the operator pulses his generators to increase
L L L L L L L L L L L L




generation. Which statement best describes his actions?
L L L L L L L




a. He followed NERC guidelines
L L L




b. He violated NERC standards
L L L




c. He helped the system
L L L




d. He has not impacted the system
L L L L L

Document information

Uploaded on
August 4, 2025
Number of pages
22
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestBankPrep
4.9
(298)
Sold
65
Followers
7
Items
1269
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions