100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NR 416 Final questions with accurate answer1

Rating
-
Sold
-
Pages
39
Grade
A+
Uploaded on
03-08-2025
Written in
2025/2026

NR 416 Final questions with accurate answer1

Institution
NR 416
Course
NR 416











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NR 416
Course
NR 416

Document information

Uploaded on
August 3, 2025
Number of pages
39
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NR 416 Final questions with accurate answers
2 types of no project alternative Ans✓✓✓ 1. when project is the
revision of an existing plan etc the no project alternative will be the
continuation of the existing plan.


2. when not revision it is the circumstance where the project does not
proceed and the analysis compares the proposed project to the property
remaining in its existing state


exception: other future uses of land or regulatory actions are reasonably
foreseeable


4 types of mitigation measures Ans✓✓✓ avoid
minimize, reduce, or eliminate
rectify
compensate


4 types of mitigation measures: avoid Ans✓✓✓ avoid the impact
altogether by not taking certain actions or parts of actions


4 types of mitigation measures: compensate Ans✓✓✓ compensate for
impact by replacing or providing substitute resources or envis

,4 types of mitigation measures: minimize reduce or eliminate Ans✓✓✓
minimize impacts by limiting the degree or magnitude of the action and
its implementation


reduce or eliminate the impact over time through preservation and
maintenance during the life of the action


4 types of mitigation measures: rectify Ans✓✓✓ rectify the impact by
repairing, rehabilitating, or restoring the affected envi


Addendum to EIR Ans✓✓✓ minor technical changes only, with no
significant impact


agency decision making process Ans✓✓✓ 1. Consider and Certify the
EIR
-certification on requirements
--FEIR completed with CEQA compliance
--Reviewed & Certified
--represents lead agency's independent judgement and analysis
2. Approve the project
-make findings
-adopt MMRP
-adopt statement of overriding considerations (SOC)
3. Issue permit

,-CEQA statute of limitation
-all other permits received
-appropriate conditions of all other approval & mitigations completed


Agency decision process post CEQA Ans✓✓✓ Consider and certify
EIR
-certification requirements
---FEIR completed in compliance with CEQA
---FEIR represents lead agency's independent judgement and analysis


Approve Project
-make findings
-adopt mitigation, monitoring, and reporting program
-adopt statement of overriding considerations (if necessary)


Issue permit
-CEQA statute of limitations
-all other permits received
-appropriate conditions of approval (and mitigations) completed


alternative site/location Ans✓✓✓ need not be evaluated in every case-
'rule of reason'

, key question: are envi impacts avoided/lessened overall?


if alternative locations are no evaluated need to disclose reasons


if alternative locations are evaluated rely on previous documents (plan,
policy, or program EIRs) to extent possible


circumstances where inclusion of alternatives sites would be
appropriate:
-public project (because eminent doamain)
-project proponent owning or controlling or having access/lease of
feasible alternative sites
-two or more developers seeking approval for same type of development
at different locations


alternatives general methodology Ans✓✓✓ 1. develop project
objectives
2. determine significant impacts to be avoided
3. develop broad list of alternatives
4. develop screening criteria
if infeasible explain why


-if feasible (conduct evaluation)
-compare to proposed project impacts

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2022
Member since
3 year
Number of followers
1344
Documents
47128
Last sold
5 days ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

369 reviews

5
162
4
84
3
52
2
22
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions