304 LCPO/DIVO EXAM (2025) Questions And Answers
Solved 100% Correct!!
What does 3M stand for? - (ANSWER)Maintenance and Material Management
What is the Navy 3M instruction? - (ANSWER)NAVSEAINST 4790.8C
What is the afloat safety manual? - (ANSWER)OPNAVINST 5100.19 (series)
What is known as the "Maintenance Bible?" - (ANSWER)43P1 (contains
everything that is in SKED 3.2 for use offline)
Who is the 3M system manager? - (ANSWER)XO
What is the ashore safety manual? - (ANSWER)OPNAVINST 5100.23 (series)
What system is an electronic version of everything contained in the 43P1? -
(ANSWER)SKED 3.2
Who is the 3M functional manager? - (ANSWER)3MC
Who reviews the weekly schedule at the beginning of the week? -
(ANSWER)Divo/WCS
, Who approves revisions? - (ANSWER)Department Heads
Who initials line outs on MIPs/MRCs? - (ANSWER)LCPO
Who initiates revisions in SKED? - (ANSWER)LCPO
Who closes out the week? - (ANSWER)Divo
What does MRC stand for? - (ANSWER)Maintenance requirement card
What is an MRC? - (ANSWER)Steps to perform specific maintenance
How often do MRCs need to be validated? - (ANSWER)Every time maintenance is
performed with that MRC
What does LOEP stand for? - (ANSWER)List of effective pages
What is another name for the LOEP? - (ANSWER)PMS 5
What is included on the LOEP? - (ANSWER)Force Revision number, date the
revision came out, workcenter, MIPs assigned to workcenter
Solved 100% Correct!!
What does 3M stand for? - (ANSWER)Maintenance and Material Management
What is the Navy 3M instruction? - (ANSWER)NAVSEAINST 4790.8C
What is the afloat safety manual? - (ANSWER)OPNAVINST 5100.19 (series)
What is known as the "Maintenance Bible?" - (ANSWER)43P1 (contains
everything that is in SKED 3.2 for use offline)
Who is the 3M system manager? - (ANSWER)XO
What is the ashore safety manual? - (ANSWER)OPNAVINST 5100.23 (series)
What system is an electronic version of everything contained in the 43P1? -
(ANSWER)SKED 3.2
Who is the 3M functional manager? - (ANSWER)3MC
Who reviews the weekly schedule at the beginning of the week? -
(ANSWER)Divo/WCS
, Who approves revisions? - (ANSWER)Department Heads
Who initials line outs on MIPs/MRCs? - (ANSWER)LCPO
Who initiates revisions in SKED? - (ANSWER)LCPO
Who closes out the week? - (ANSWER)Divo
What does MRC stand for? - (ANSWER)Maintenance requirement card
What is an MRC? - (ANSWER)Steps to perform specific maintenance
How often do MRCs need to be validated? - (ANSWER)Every time maintenance is
performed with that MRC
What does LOEP stand for? - (ANSWER)List of effective pages
What is another name for the LOEP? - (ANSWER)PMS 5
What is included on the LOEP? - (ANSWER)Force Revision number, date the
revision came out, workcenter, MIPs assigned to workcenter