with 100% Correct Answers | Latest
Update
1-For which of the following would a LEED Green Associate use the Green
Building Information Gateway (GBIG)? - 🧠 ANSWER ✔✔D. Exploring and
comparing the green dimensions of the built environment.
2-What factor impacts the cost of earning LEED-certification? - 🧠 ANSWER
✔✔D. Square footage of the building.
3-A university client asks about certifying multiple buildings. Which of the
following is an appropriate response? - 🧠 ANSWER ✔✔B. The Campus Program
can be used for projects not necessarily uniform in design or operations but located
on a single campus location.
,4-Who is responsible for ensuring the use of the consensus process to evolve
LEED in accordance with the mission, guiding principles, and strategic plan of
USGBC? - 🧠 ANSWER ✔✔C. LEED Steering Committee.
5-What is the International Green Construction Code (IgCC) intended to replace? -
🧠 ANSWER ✔✔D. Traditional building codes.
6-Which of the following is NOT a component of the impact category Enhance
Social Equity, Environmental Justice, Community Health and Quality of Life? - 🧠
ANSWER ✔✔E. Support Occupant Comfort and Well-Being.
7-When there are two or more rating systems that might be applicable to a project,
how should the project team decide which rating system to use? - 🧠 ANSWER
✔✔A. Use the 40/60 rule.
8-A multi-family building that is 3 stories tall would be certified under what rating
system? - 🧠 ANSWER ✔✔D. LEED BD+C: Homes.
9-A project that earns 65 points would earn what level of certification? - 🧠
ANSWER ✔✔A. Gold.
10-What LEED rating system helps create better, more sustainable, well-connected
neighborhoods? - 🧠 ANSWER ✔✔B. LEED ND.
, 3
11-Which of the following defines the types of buildings, spaces, and
neighborhoods that the LEED rating system is designed to evaluate? - 🧠 ANSWER
✔✔D. Minimum Program Requirements.
12-Promoting the triple bottom line is a part of USGBC's: - 🧠 ANSWER ✔✔D.
Guiding principles.
13-The area of a project site that is used by the building structure, defined by the
perimeter of the building plan is the: - 🧠 ANSWER ✔✔B. Building footprint.
14-What is true about a project that earns 38 points towards certification? - 🧠
ANSWER ✔✔B. The project would not earn certification.
15-What LEED credit category rewards projects within relatively dense areas, near
diverse uses, with access to a variety of transportation options, or on sites with
development constraints? - 🧠 ANSWER ✔✔B. Location and Transportation.
16-Which of the following determines the level of certification a project earns? - 🧠
ANSWER ✔✔C. The number of points a project earns.
17-What LEED developments address specific space types and international
requirements? - 🧠 ANSWER ✔✔C. LEED Rating System adaptations.
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED
, 18-What is the point range for a project to earn LEED Gold? - 🧠 ANSWER ✔✔A.
60-79.
19-What statement is true regarding the LEED Scorecard? - 🧠 ANSWER ✔✔C.
The LEED Scorecard is organized by LEED category.
20-Where should a project team go for updates and errata for the LEED BD+C:
New Construction rating system? - 🧠 ANSWER ✔✔C. usgbc.org.
21-What are the basic types of LEED improvements that are updated through
revisions on a regular development cycle? - 🧠 ANSWER ✔✔A. Errata and
Addenda.
B. Next version of LEED.
C. Adaptations.
22-Exemplary performance and pilot credits are awarded in what LEED category?
- 🧠 ANSWER ✔✔D. Innovation.
23-Which of the following are mandatory for LEED certification? - 🧠 ANSWER
✔✔A. Meeting the Minimum Program Requirements.
E. Meeting all prerequisites.