Questions and CORRECT Answers
TCEQ - CORRECT ANSWER - Who adopted the current OSSF Rules in 1997 and
revised them several times?
Designated Representative - CORRECT ANSWER - Who is responsible for reviewing
permit applications, site evaluations, planning materials, and conducting inspections of OSSF's?
Installer - CORRECT ANSWER - An individual who holds a valid license from the TCEQ
and who is compensated by another individual to construct, install, alter, or repair an OSSF in an
___
Site Evaluator - CORRECT ANSWER - An individual who visits a site and conducts soil
evaluations and a site survey is an___
Installer II and Mainetence Provider - CORRECT ANSWER - What are the two OSSF
licenses that require previous experience?
Civil, Criminal, Administrative - CORRECT ANSWER - What are the penalities for
violating the laws?
PE or RS - CORRECT ANSWER - Planning materials for an OSSF utilizing secondary
treatment must be prepared by an
Installer II - CORRECT ANSWER - Who can legally install a septic tank followed by a
low pressure dosing drainfield at a rental house?
5 - CORRECT ANSWER - OSHA requires that all excavations over ___ feet deep be
sloped, shored, or otherwise supported before a person enters