8/1/25, 7:38 AM ICC Vapor Recovery 1 Pt. 2 EXAM, SOLUTIONS (MULTIPLE CHOICES) (A+ GRADED 100% VERIFIED) LATEST VERSION 2025!!…
ICC Vapor Recovery 1 Pt. 2 EXAM, SOLUTIONS
(MULTIPLE CHOICES) (A+ GRADED 100%
VERIFIED) LATEST VERSION 2025!!
Save
Terms in this set (54)
Under Dispenser c. standards of an independent testing organization
Containment is required to with industry code
be designed and
constructed in
accordance with ____.
a. the appropriate
Executive Order
b. Generally accepted
secondary containment
practices
c. standards of an
independent testing
organization with industry
code
d. an engineering
specification approved by
a state registered
professional engineer or
engineering standard
https://quizlet.com/1063347838/icc-vapor-recovery-1-pt-2-exam-solutions-multiple-choices-a-graded-100-verified-latest-version-2025-flash-cards/?new 1/19
,8/1/25, 7:38 AM ICC Vapor Recovery 1 Pt. 2 EXAM, SOLUTIONS (MULTIPLE CHOICES) (A+ GRADED 100% VERIFIED) LATEST VERSION 2025!!…
With a Gilbarco Vapor- b. 75%
Vac, the OPW 12VW
nozzle has a hole or tear
in the vapor escape guard,
it is a defect if ____% of the
circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65%
Gasoline threa sealant can a. threaded portion of rotatable adaptors
be used on all except _____.
a. threaded portion of
rotatable adaptors
b. p/v valve
c. ball float
d. riser adaptor
when installing copper d. copper stretching tool
tubing use all except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool
The Husky P/V valve has a b. 20-50 lbs
torque range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs
https://quizlet.com/1063347838/icc-vapor-recovery-1-pt-2-exam-solutions-multiple-choices-a-graded-100-verified-latest-version-2025-flash-cards/?new 2/19
, 8/1/25, 7:38 AM ICC Vapor Recovery 1 Pt. 2 EXAM, SOLUTIONS (MULTIPLE CHOICES) (A+ GRADED 100% VERIFIED) LATEST VERSION 2025!!…
When installing the d. oil or grease
hanging hardware
together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease
When installing in the EO d. all the above
VR-101-E you should have
on site _____.
a. the executive order
b. phil-tite installation
manual
c. the equipment checklist
d. all the above
There are four ball valves c. top valve open, the rest are closed
on the clean air separator,
what position are they to
be in?
a. top and bottom valve
open, the rest are closed
b. top and bottom valve
closed, the rest are open
c. top valve open, the rest
are closed
d. bottom valve open, the
rest are closed
https://quizlet.com/1063347838/icc-vapor-recovery-1-pt-2-exam-solutions-multiple-choices-a-graded-100-verified-latest-version-2025-flash-cards/?new 3/19
ICC Vapor Recovery 1 Pt. 2 EXAM, SOLUTIONS
(MULTIPLE CHOICES) (A+ GRADED 100%
VERIFIED) LATEST VERSION 2025!!
Save
Terms in this set (54)
Under Dispenser c. standards of an independent testing organization
Containment is required to with industry code
be designed and
constructed in
accordance with ____.
a. the appropriate
Executive Order
b. Generally accepted
secondary containment
practices
c. standards of an
independent testing
organization with industry
code
d. an engineering
specification approved by
a state registered
professional engineer or
engineering standard
https://quizlet.com/1063347838/icc-vapor-recovery-1-pt-2-exam-solutions-multiple-choices-a-graded-100-verified-latest-version-2025-flash-cards/?new 1/19
,8/1/25, 7:38 AM ICC Vapor Recovery 1 Pt. 2 EXAM, SOLUTIONS (MULTIPLE CHOICES) (A+ GRADED 100% VERIFIED) LATEST VERSION 2025!!…
With a Gilbarco Vapor- b. 75%
Vac, the OPW 12VW
nozzle has a hole or tear
in the vapor escape guard,
it is a defect if ____% of the
circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65%
Gasoline threa sealant can a. threaded portion of rotatable adaptors
be used on all except _____.
a. threaded portion of
rotatable adaptors
b. p/v valve
c. ball float
d. riser adaptor
when installing copper d. copper stretching tool
tubing use all except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool
The Husky P/V valve has a b. 20-50 lbs
torque range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs
https://quizlet.com/1063347838/icc-vapor-recovery-1-pt-2-exam-solutions-multiple-choices-a-graded-100-verified-latest-version-2025-flash-cards/?new 2/19
, 8/1/25, 7:38 AM ICC Vapor Recovery 1 Pt. 2 EXAM, SOLUTIONS (MULTIPLE CHOICES) (A+ GRADED 100% VERIFIED) LATEST VERSION 2025!!…
When installing the d. oil or grease
hanging hardware
together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease
When installing in the EO d. all the above
VR-101-E you should have
on site _____.
a. the executive order
b. phil-tite installation
manual
c. the equipment checklist
d. all the above
There are four ball valves c. top valve open, the rest are closed
on the clean air separator,
what position are they to
be in?
a. top and bottom valve
open, the rest are closed
b. top and bottom valve
closed, the rest are open
c. top valve open, the rest
are closed
d. bottom valve open, the
rest are closed
https://quizlet.com/1063347838/icc-vapor-recovery-1-pt-2-exam-solutions-multiple-choices-a-graded-100-verified-latest-version-2025-flash-cards/?new 3/19