ESTIMATING TEST 1 REVIEW QUESTIONS WITH
VERIFIED ANSWERS
>> The comprehensive documentation, associated calculations, references and backup used to
determine the expected cost of materials, labor, subcontractors, equipment, profit and
overhead for a proposed construction project.
- correct answer- Estimating



>> The act of quantifying materials and assigning the resources, and associated pricing, to all
work items (tasks) on a construction project.
- correct answer- Estimating



>> An educated guess which affects the cost of the work you are pricing.
- correct answer- Assumptions



>> Provided to back up your assumptions. Explain the reason or thug precess behind your
assumptions and identify what you have priced.
- correct answer- Justifications



>> A cost estimate, typically submitted to the project Owner, which consists of direct
construction costs including field supervision, plus markup to cover general overhead and profit.
- correct answer- Bid



>> Money added to a project to account for items that are difficult to identify/quantify at the
time the base estimate is prepared.
- correct answer- Contingency

, Page 2 of 13



>> A formal question (typically from a contractor) submitted in writing to the design team to
clarify and provide direction concerning the the contract documents.
- correct answer- Request for Information (RFI)



>> A formal written request (typically from an Owner, to Contractor) for pricing of a proposed
project. Typically inclusive of a project scope of work.
- correct answer- Request for Proposal (RFP)



>> A change in construction methods or design directed by the design team during bidding,
before a contract has been awarded.
- correct answer- Addendum



>> __ are priced by all competing contractors and the costs are included in the bid price.
- correct answer- Addenda



>> A change in construction methods or rising methods or design directed by the design team,
after a contract has been awarded.
- correct answer- Change order



>> __ are priced by the contractor who has been awarded the contract. Costs are negotiated
and added to the current contract price.
- correct answer- Change orders



>> Generally, a single "piece" of whatever we are quantifying or pricing.


Ex. CY, SF, etc.
- correct answer- Unit

Document information

Uploaded on
July 31, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.29

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
398
Last sold
7 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions