CSI CDT: CSI CDT Exam Study Guide: Questions & Answers: Latest Updated Guide Solution
Six Project Delivery Methods (AnsDesign-Bid-Build Design-Negotiate-Build CMA Design-Build Owner-Build Integrated Project Delivery Total Project Commissioning (Ans- Quality process utilizing an independent company providing services. Commissioning continues through the construction stage of the project to provide QA/QC. Life Cycle Costs (Ans- Total cost of ownership. Initial construction costs as well as renovation, remodeling, and improvements.Alternate (Ans- Portion of the work that is priced separately and thus provides and option for owner in determining final scope. Additive or deductive work item. Unit Price (Ans- Type of work is defined, but extent is unknown of likely to change. Cash Allowance (Ans- Monetary sum specified by A/E and included in price of project to pay for unspecified products. Included required taxes. Cost Estimate (Ans- *Estimate is not a price.* Opinion of probably cost of construction. Cost Estimate Techniques (AnsOrder of Magnitude Unit of Measure Assemblies or SystemsUnit Price Invitation to Bid (Ans- Intended to attract qualified bidders. Selected/limited. Advertisement to Bid (Ans- A notice to all qualified bidders
Document information
- Uploaded on
- July 31, 2025
- Number of pages
- 32
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers