_________ are necessary for complete combustion - ANS time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - ANS 214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi - ANS 12 an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo- generator - ANS steam turbine a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of 500 degrees Fahrenheit. The steam produced is _______ steam - ANS superheated the economizer on a boiler is used to _______ - ANS add heat to the feed water blowers are normally used with________ boilers - ANS water tube overheating of tubes on a boiler can be caused by________ - ANS scale on tubes 3RD CLASS STATIONARY STEAM ENGINEER LICENSE PREP EXAM 2025 QUESTIONS AND ANSWERS 2 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED carbon dioxide in a condensate return system causes_________ - ANS channeling a ________ pump is a positive displacement pump - ANS reciprocating a boiler generating 6000 lb of steam/hr produces _______btu/hr - ANS 6,000,000 a bottom blowdown is performed on a boiler to _____ - ANS discharge sludge and sediment water columns are connected to the boiler with a minimum of _______" pipe - ANS 1 the minimum size of a water column blowdown valve is_______". - ANS 3/4 the maximum size bottom blowdown valve on a boiler is_________". - ANS 2 1/2 a ________ allows condensate to pass through, but stops Steam. - ANS a steam trap when taking over a shift, the first thing to do is check the________ - ANS water level in each boiler according to the asme code, a high-pressure boiler having more than 500 square feet of heating surface shall have________ - ANS two or more safety valves the probable cause of an increase in temperature of gases of combustion at the boiler Outlet is____ - ANS dirty heating services boilers in battery equipped with________ must have two main steam stop valves and a free- flowing drain between them - ANS manhole openings 3 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED in order to be sure the gauge glass is indicating an accurate water level reading, the stationary engineer should______ - ANS blowdown the gauge glass a continuous blowdown line is located___ - ANS in the Steam and water drum well below the nowl a temperature reading of 80 degrees Celsius is equal to_________°f - ANS 176 a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______ - ANS poor efficiency a manometer is red in________ - ANS inches of water the boiling point of water will____ with an increase in pressure - ANS be raised if a lather is not obtained when performing a soap hardness test, the water sample is_______ - ANS hard combustion efficiency can be increased when air is________ - ANS preheated ______ draft is produced by a fan located between the boiler and the chimney - ANS induced the overspeed trip on a steam turbine should be tested ______ - ANS before putting the steam turbine on-line a high CO2 readin

Show more Read less
Institution
STATIONARY STEAM ENGINEER LICENSE
Course
STATIONARY STEAM ENGINEER LICENSE










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
STATIONARY STEAM ENGINEER LICENSE
Course
STATIONARY STEAM ENGINEER LICENSE

Document information

Uploaded on
July 30, 2025
Number of pages
23
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

3RD CLASS STATIONARY STEAM
ENGINEER LICENSE PREP EXAM 2025
QUESTIONS AND ANSWERS



_________ are necessary for complete combustion - ANS time, temperature, mixture, and
atomization



if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - ANS 214.7


a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The
blowdown is______psi - ANS 12


an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-
generator - ANS steam turbine


a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of
500 degrees Fahrenheit. The steam produced is _______ steam - ANS superheated



the economizer on a boiler is used to _______ - ANS add heat to the feed water



blowers are normally used with________ boilers - ANS water tube



overheating of tubes on a boiler can be caused by________ - ANS scale on tubes

1 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED

,carbon dioxide in a condensate return system causes_________ - ANS channeling



a ________ pump is a positive displacement pump - ANS reciprocating



a boiler generating 6000 lb of steam/hr produces _______btu/hr - ANS 6,000,000



a bottom blowdown is performed on a boiler to _____ - ANS discharge sludge and sediment



water columns are connected to the boiler with a minimum of _______" pipe - ANS 1



the minimum size of a water column blowdown valve is_______". - ANS 3/4



the maximum size bottom blowdown valve on a boiler is_________". - ANS 2 1/2



a ________ allows condensate to pass through, but stops Steam. - ANS a steam trap



when taking over a shift, the first thing to do is check the________ - ANS water level in each
boiler


according to the asme code, a high-pressure boiler having more than 500 square feet of heating
surface shall have________ - ANS two or more safety valves


the probable cause of an increase in temperature of gases of combustion at the boiler Outlet
is____ - ANS dirty heating services


boilers in battery equipped with________ must have two main steam stop valves and a free-
flowing drain between them - ANS manhole openings
2 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED

, in order to be sure the gauge glass is indicating an accurate water level reading, the stationary
engineer should______ - ANS blowdown the gauge glass



a continuous blowdown line is located___ - ANS in the Steam and water drum well below the
nowl



a temperature reading of 80 degrees Celsius is equal to_________°f - ANS 176


a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______
- ANS poor efficiency



a manometer is red in________ - ANS inches of water



the boiling point of water will____ with an increase in pressure - ANS be raised


if a lather is not obtained when performing a soap hardness test, the water sample is_______ -
ANS hard



combustion efficiency can be increased when air is________ - ANS preheated



______ draft is produced by a fan located between the boiler and the chimney - ANS induced



the overspeed trip on a steam turbine should be tested ______ - ANS before putting the
steam turbine on-line



a high CO2 reading in the gases of combustion is a sign of____ - ANS High combustion
efficiency


3 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainbarter Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
328
Member since
2 year
Number of followers
153
Documents
22238
Last sold
4 days ago
A+ STUDY MATERIALS.

We offer a wide range of high-quality study materials, including study guides practice exams and flashcards. WELCOME.

3.5

54 reviews

5
21
4
8
3
12
2
4
1
9

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions