• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Up Return To Work Study Guide With Complete Solutions

Document preview thumbnail
Preview 2 out of 10 pages

UP RETURN TO WORK STUDY GUIDE WITH COMPLETE SOLUTIONS /. "Stowed" requires (2.21/Glossary) - Answer-Having personal electronic devices powered off and out of sight. Devices in pockets are not stowed. /.Your 5,681 ton train goes into emergency at a speed of 21mph. No unusual slack action was felt and the brake pipe pressure was immediately restored after stopping. Will you be required to walk the train? 6.23 - Answer-No, you are relieved of having to check it due to the speed being over 20mph, no unusual slack action was felt, and the brake pipe pressure was immediately restored after stopping. /.What is your crew's responsibility to the trian dispatcher regarding an emergency application of the air brakes? 6.31 - Answer-Unclear. Listed rule does not match description. /.Reverse Movement (Glossary) - Answer-Movement in the opposite direction of authorized movement /.When moving on the main track or siding, are you required to ring the bell continuously while passing standing equipment on the adjacent track? 5.8.1 - Answer-Yes. /.What is required when delayed within a block in CTC limits when PTC is not in effect? 9.9 - Answer-Proceed prepared to stop at the next signal until the next signal is visible and that signal displays a proceed indication. /.What actions are required before fouling or crossing a track? (81.2.1) - Answer-Look in both directions Ensure no movement is closely approaching Look for conditions that could interfere with footing /.How may your train be authorized by a stop indication at a manual interlocking? 9.12.2 - Answer-Contact control operator who will give permission when it is known that the route is properly lined and no conflicting movement is occupying or authorized to enter the track between that signal and the next absolute signal. /.Pounds of brake pipe pressure that must be present at the rear of the train before beginning an Initial Terminal Air Brake Test (Class 1) 30.3/30.10.1 - Answer-90 /.while flagging a signal at a manual interlocking, the dispatcher calls and tells you to pick up a repaired bad order car off the next siding. How will you answer the dispatcher's request? Your train is operating at restricted speed. 1.47.1 - Answer-Tell dispatcher you are in a cab red zone and cannot respond. /.Are you required to obtain Red Zone Protection before releasing the hand brakes on your train while the car department has your train blue flagged? 81.5.4/5.13 - Answer-You are not allowed to release the hand brakes on your train while the train is blue flagged unless directed by the employee who placed the blue flag or the EIC of the employees working on the blue flagged train. /.When operating west of El Paso, where must you place an empty multiplatform spine car in your manifest train to comply with train make-up restrictions? SSI Item 5-B - Answer-Behind a car with no more than 4500 tons /.Before cutting away from the rear portion of your train with a set out, what securement procedure would you use? 32.1.3/32.1/32.1.1 - Answer-Tie sufficient hand brakes Make a 20psi brake pipe reduction Close angle cock on Locomotive after brake pipe exhaust ceases Leave angle cock open on the portion left standing to ensure air is not bottled /.The dispatcher would like you to handle the switch for a pick-up off a controlled siding within CTC. Descrive how this switching move could be made using the switch in hand position. 9.13.2 - Answer-Job brief with dispatcher on moves to be made, receive authority to enter the control point, and receive permission to place the switch in hand operation. Unlock switch lock, place selector lever in hand position. Operate hand throw lever until switch points are seen to move, even if it is already lined for intended route. Line switch for your route. Do not return power to switch until final movement has been made over the switch. /.If it is necessary to work between a yard track and the adjacent CTC controlled siding, will you be required to obtain Track Breach Protection? SSI Item 12 - Answer-Yes. /.After doubling a solid block of cars to your train, what air brake test(s) and inspections will be necessary before departing? 30.7.1 & Glossary - Answer-Class III Application and Release of brakes. /.What is required before an employee may choose to ride on moving equipment? 81.7 - Answer-Other ways to complete task without needing to ride on equipment Weather conditions Car design and configuration that may make it unsuitable to ride Your physical limitations Potential slack action Applicable Operating and Safety Rules /.After completing a train inspection for a hot journal, how may the train be shoved back to pick up a crew member? 6.6 - Answer-Movement will not exceed limits of train and trains length. Will not enter or foul public crossing unless proving warning per rule 6.32.1. Cannot be made into or within yard limits, restricted limits, interlocking limits, drawbridges, rr crossings at grade, or track bulletin form b limits.

Content preview

UP RETURN TO WORK STUDY GUIDE WITH
COMPLETE SOLUTIONS

/. "Stowed" requires (2.21/Glossary) - Answer-Having personal electronic devices
powered off and out of sight. Devices in pockets are not stowed.

/.Your 5,681 ton train goes into emergency at a speed of 21mph. No unusual slack
action was felt and the brake pipe pressure was immediately restored after stopping.
Will you be required to walk the train? 6.23 - Answer-No, you are relieved of having to
check it due to the speed being over 20mph, no unusual slack action was felt, and the
brake pipe pressure was immediately restored after stopping.

/.What is your crew's responsibility to the trian dispatcher regarding an emergency
application of the air brakes? 6.31 - Answer-Unclear. Listed rule does not match
description.

/.Reverse Movement (Glossary) - Answer-Movement in the opposite direction of
authorized movement

/.When moving on the main track or siding, are you required to ring the bell continuously
while passing standing equipment on the adjacent track? 5.8.1 - Answer-Yes.

/.What is required when delayed within a block in CTC limits when PTC is not in effect?
9.9 - Answer-Proceed prepared to stop at the next signal until the next signal is visible
and that signal displays a proceed indication.

/.What actions are required before fouling or crossing a track? (81.2.1) - Answer-Look in
both directions
Ensure no movement is closely approaching
Look for conditions that could interfere with footing

/.How may your train be authorized by a stop indication at a manual interlocking? 9.12.2
- Answer-Contact control operator who will give permission when it is known that the
route is properly lined and no conflicting movement is occupying or authorized to enter
the track between that signal and the next absolute signal.

/.Pounds of brake pipe pressure that must be present at the rear of the train before
beginning an Initial Terminal Air Brake Test (Class 1) 30.3/30.10.1 - Answer-90

/.while flagging a signal at a manual interlocking, the dispatcher calls and tells you to
pick up a repaired bad order car off the next siding. How will you answer the
dispatcher's request? Your train is operating at restricted speed. 1.47.1 - Answer-Tell
dispatcher you are in a cab red zone and cannot respond.

, /.Are you required to obtain Red Zone Protection before releasing the hand brakes on
your train while the car department has your train blue flagged? 81.5.4/5.13 - Answer-
You are not allowed to release the hand brakes on your train while the train is blue
flagged unless directed by the employee who placed the blue flag or the EIC of the
employees working on the blue flagged train.

/.When operating west of El Paso, where must you place an empty multiplatform spine
car in your manifest train to comply with train make-up restrictions?
SSI Item 5-B - Answer-Behind a car with no more than 4500 tons

/.Before cutting away from the rear portion of your train with a set out, what securement
procedure would you use? 32.1.3/32.1/32.1.1 - Answer-Tie sufficient hand brakes
Make a 20psi brake pipe reduction
Close angle cock on Locomotive after brake pipe exhaust ceases
Leave angle cock open on the portion left standing to ensure air is not bottled

/.The dispatcher would like you to handle the switch for a pick-up off a controlled siding
within CTC. Descrive how this switching move could be made using the switch in hand
position. 9.13.2 - Answer-Job brief with dispatcher on moves to be made, receive
authority to enter the control point, and receive permission to place the switch in hand
operation. Unlock switch lock, place selector lever in hand position. Operate hand throw
lever until switch points are seen to move, even if it is already lined for intended route.
Line switch for your route. Do not return power to switch until final movement has been
made over the switch.

/.If it is necessary to work between a yard track and the adjacent CTC controlled siding,
will you be required to obtain Track Breach Protection? SSI Item 12 - Answer-Yes.

/.After doubling a solid block of cars to your train, what air brake test(s) and inspections
will be necessary before departing? 30.7.1 & Glossary - Answer-Class III Application
and Release of brakes.

/.What is required before an employee may choose to ride on moving equipment? 81.7 -
Answer-Other ways to complete task without needing to ride on equipment
Weather conditions
Car design and configuration that may make it unsuitable to ride
Your physical limitations
Potential slack action
Applicable Operating and Safety Rules

/.After completing a train inspection for a hot journal, how may the train be shoved back
to pick up a crew member? 6.6 - Answer-Movement will not exceed limits of train and
trains length. Will not enter or foul public crossing unless proving warning per rule
6.32.1. Cannot be made into or within yard limits, restricted limits, interlocking limits,
drawbridges, rr crossings at grade, or track bulletin form b limits.

Document information

Uploaded on
July 28, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam
3.4
(30)
Sold
160
Followers
7
Items
8386
Last sold
4 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions