CPL250 Facility - Laboratory -Section
Exam 2026 Questions and Answers
What type of record do you need to build so that Users can order a test? - Answer -
Procedure record
What do you need to build so users can enter numeric or category based results for
a test? - Answer -Result Component (LRR)
What is built to allow the system to know what the lab should perform when a
certain procedure is ordered, and in which lab? - Answer -Test record (OVT)
A numeric result can be automatically calculated using what? - Answer -An
equation (FCE)
What do you build to apply common discrete results to a test? - Answer -
Mnemonic (OVD)
This is what is build so a test and a question can be linked together - Answer -
Questionnaire (LQF)
What must be build first a Question or Questionnaire? - Answer -Questionnaire
©COPYRIGHT 2025, ALL RIGHTS RESERVED 1
, Which of the following records is most efficient to build last, and why?
- Result component
-Test
-Procedure - Answer -The test (OVT) record should be built last because in the test
record you link out to the result component (LRR) and procedure record (EAP) so
it is more efficient if those records are built 1st so you don't have to keep going in
and our of records to link them together.
Does it matter for efficiency if result components are listed before procedures?
Why or why not? - Answer -No, it does not matter because the result components
(LRR) are not linked directly to the procedure.
All test collected into your department that can be performed at the CJB West lab
should be accessioned there. IF a test cannot be performed there, it should be
performed at the EMG Hospital Lab instead.
In which record will you specify the order of labs that the system should try to
accession specimens to? - Answer -Department record (DEP)
In which record will you specify which lab a test can actually be performed in? -
Answer -Test (OVT)
©COPYRIGHT 2025, ALL RIGHTS RESERVED 2
Exam 2026 Questions and Answers
What type of record do you need to build so that Users can order a test? - Answer -
Procedure record
What do you need to build so users can enter numeric or category based results for
a test? - Answer -Result Component (LRR)
What is built to allow the system to know what the lab should perform when a
certain procedure is ordered, and in which lab? - Answer -Test record (OVT)
A numeric result can be automatically calculated using what? - Answer -An
equation (FCE)
What do you build to apply common discrete results to a test? - Answer -
Mnemonic (OVD)
This is what is build so a test and a question can be linked together - Answer -
Questionnaire (LQF)
What must be build first a Question or Questionnaire? - Answer -Questionnaire
©COPYRIGHT 2025, ALL RIGHTS RESERVED 1
, Which of the following records is most efficient to build last, and why?
- Result component
-Test
-Procedure - Answer -The test (OVT) record should be built last because in the test
record you link out to the result component (LRR) and procedure record (EAP) so
it is more efficient if those records are built 1st so you don't have to keep going in
and our of records to link them together.
Does it matter for efficiency if result components are listed before procedures?
Why or why not? - Answer -No, it does not matter because the result components
(LRR) are not linked directly to the procedure.
All test collected into your department that can be performed at the CJB West lab
should be accessioned there. IF a test cannot be performed there, it should be
performed at the EMG Hospital Lab instead.
In which record will you specify the order of labs that the system should try to
accession specimens to? - Answer -Department record (DEP)
In which record will you specify which lab a test can actually be performed in? -
Answer -Test (OVT)
©COPYRIGHT 2025, ALL RIGHTS RESERVED 2