• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

CET 2343 Exam 3 Comprehensive Questions (Frequently Tested) with Verified Answers Graded A+

Document preview thumbnail
Preview 2 out of 6 pages

CET 2343 Exam 3 Comprehensive Questions (Frequently Tested) with Verified Answers Graded A+

Content preview

CET 2343 Exam 3
Comprehensive Questions
(Frequently Tested) with
Verified Answers Graded A+
According to ASTM C94, the concrete manufacturer should furnish the purchaser a delivery
ticket with information about the location of ready-mix batch plant and truck number. - Answer:
true



Materials for ready mixed concrete is batching by only volume. - Answer: false



Liquid admixtures are batched by volume in fluid ounces - Answer: true



Powered admixtures are batched by volume in fluid ounces. - Answer: false



What are the discharge time and revolution limits per ASTM C94? - Answer: 1.5 hours, no
revolution limit



When ordering concrete, the common practice has been to order _____ of concrete calculated
from form dimensions during construction. - Answer: 3 to 10 % more than the exact calculated
amount

, Concrete can be commonly transported from the batch plant to the jobsite using ______? -
Answer: Ready-mix truck



What are the two common types of concrete batch plants? - Answer: dry batch plant and
central batch plant



What is the difference between dry batch plants and central batch plants? - Answer: dry batch
mixes concrete in the truck and central batch uses a central mixer.



What are the different equipment within a batch plant? - Answer: cement silo, fly ash silo,
aggregate bins, batch house, water tank, admixture tanks



From a dry batch plant, a concrete mixture design can be commonly batched to the nearest 1 lb.
- Answer: false



According to ASTM C 94, how many revolutions must a ready-mix truck turn for a dry batch
plant? - Answer: 70



What is the place that monitors and controls the operation of a concrete batch plant? - Answer:
batch house



If a ready-mix truck is needed to arrive on the jobsite at 9:00 am, when should the ready-mix
truck start loading if the job is a 25 minutes drive and it takes 10 minutes to load the ready-mix
truck? - Answer: 8:25 am



The common dry batch sequence of typical concrete mixtures has headwater of roughly 2/3 and
tailwater of roughly 1/3 - Answer: true

Document information

Uploaded on
July 27, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug
4.1
(74)
Sold
225
Followers
27
Items
18088
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions