PJM Generation Cert UPDATED ACTUAL Exam Questions and CORRECT Answers Actions in low voltage alert? - CORRECT ANSWER outages Request reactive reserve check -Review transmission & generation Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - CORRECT ANSWER -Bulk Power System Manual load dump warning & reduction of Non-critical plant load issued when? - CORRECT ANSWER -Primary reserve is less the the largest generating unit. Loss of transmission facility jeopardize reliability after all possible measures have been taken

Show more Read less
Institution
PJM Generation
Course
PJM Generation










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM Generation
Course
PJM Generation

Document information

Uploaded on
July 26, 2025
Number of pages
27
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

PJM Generation Cert UPDATED ACTUAL
Exam Questions and CORRECT Answers
Actions in low voltage alert? - CORRECT ANSWER -Review transmission & generation
outages
Request reactive reserve check


Heavy load voltage schedule warning purpose is to have members prepare far max support of
voltages on the? - CORRECT ANSWER -Bulk Power System


Manual load dump warning & reduction of Non-critical plant load issued when? - CORRECT
ANSWER -Primary reserve is less the the largest generating unit.
Loss of transmission facility jeopardize reliability after all possible measures have been taken to
increase reserves


Hot weather alert - CORRECT ANSWER -COMED 90
DOM & EKPC 95


PJM issues high system voltage message - CORRECT ANSWER -Gen operators should
operate the lower end of their voltage bandwidth


Primary reserve warning - CORRECT ANSWER -Ensure deffer able Maintenance is
halted


General actions PJM takes when conservating ops initiated? - CORRECT ANSWER -
Purchase/load additional reserves
begin studying double contingencies
Lower IROL
Increase # of SOS calls

,Purpose of heavy voltage schedule action is to increase reactive reserves - CORRECT
ANSWER -EHV system



National terrorism advisory system 2 types of alerts? - CORRECT ANSWER -Elevated
threat
Imminent threat


Non-critical plant load - CORRECT ANSWER -lighting, office area a/c



Purpose of capacity emergency warning? - CORRECT ANSWER -keep members
informed of actual capacity shortages or contingencies that may jeopardize reliability during RT
ops


keep all affected system personnel aware of the forecast and actual status of the PJM RTO


Heavy load voltage schedule action - CORRECT ANSWER -Gen operators- maintain
MVAR reserve on units connected to EHV


During cold weather action - CORRECT ANSWER -Assume an unavailability rate for
scheduled generation


During terrorism/sabotage emphasis on? - CORRECT ANSWER -Operations &
communications


For voltage support TOs can request? - CORRECT ANSWER -Generators stay online


During Restoration what is removed from service until sufficient load restored to maintain
voltage - CORRECT ANSWER -Shunt capacitors

, Freq change=(load change/connected capacity)X Gov droop in percentage - CORRECT
ANSWER -



LMP calculated day ahead market - CORRECT ANSWER -Every hour
RT every 5mins


Penalty factor - - CORRECT ANSWER -incremental loss for a bus used to include the
effect of losses on the dispatch


All call types - CORRECT ANSWER -Operational, Emergency Messages, Informational



Voltage reduction Alert- - CORRECT ANSWER -Est. operating reserve capacity is less
than forecasted synchronized reserve equipment


Generation owners - CORRECT ANSWER -Must handle environmental Alerts



Emergency requires action to? - CORRECT ANSWER -Maintain freq prevent load loss,
ensure safety and reliability


Alerts - CORRECT ANSWER -Advance of operating day



Warning & actions - CORRECT ANSWER -During that day



Emergency situation - CORRECT ANSWER -Implement procedures within 30min



STE- Short term emergency rating - CORRECT ANSWER -



Low voltage alerts - CORRECT ANSWER -Analyze reactive capabilities

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1053
Member since
1 year
Number of followers
100
Documents
68976
Last sold
1 hour ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reviews

5
72
4
30
3
42
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions