Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

PJM Gen Cert UPDATED Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 10 pages

PJM Gen Cert UPDATED Exam Questions and CORRECT Answers Real time transmission constraints or contingencies may be alleviated with generators operating.... - CORRECT ANSWER -off cost (out of merit) Monitoring LMP may give insights into.... - CORRECT ANSWER -system constraints PJM calls for which of the following to recover the ACE so that tie line schedules are maintained? - CORRECT ANSWER -synchronized reserves

Content preview

PJM Gen Cert UPDATED Exam Questions
and CORRECT Answers
Real time transmission constraints or contingencies may be alleviated with generators
operating.... - CORRECT ANSWER -off cost (out of merit)



Monitoring LMP may give insights into.... - CORRECT ANSWER -system constraints


PJM calls for which of the following to recover the ACE so that tie line schedules are
maintained? - CORRECT ANSWER -synchronized reserves


If not cancelled by PJM, the minimum generation alert expires.... - CORRECT
ANSWER -at the end of the specified load period


When PJM declares a hot weather alert, the generation dispatcher should.... - CORRECT
ANSWER -determine if maintenance can be deferred and notify all generating stations and
key personnel


During system restoration, the two categories of reserves are.... - CORRECT ANSWER -
dynamic and spinning


During System Restoration, frequency should be maintained between.... - CORRECT
ANSWER -59.75 and 61.00 Hz


PJM issues a heavy load voltage schedule. Member companies who own generation should.... -
CORRECT ANSWER -ensure voltage regulators on generating units are in service on
automatic


A unit being dispatched economically by PJM should set its MW output based on the.... -
CORRECT ANSWER -units dispatch rate or desired mw level

, A fossil steam unit is considered fuel limited when it is not capable of running at its maximum
capacity for the next.... - CORRECT ANSWER -72 hours


During system restoration prior to synchronization of a unit, the dispatcher should ensure
sufficient load is available to.... - CORRECT ANSWER -stabilize unit operation


A large unit in an external control area near PJM/PJM West trips. The PJM operator will see
ACE.... - CORRECT ANSWER -remain the same, frequency decrease



LMPs will change.... - CORRECT ANSWER -when marginal generator output changes



The two control signals sent by the PJM EMS are.... - CORRECT ANSWER -Regulation
and dispatch rate/desired mw output


Which of the following one-way communication systems is used to disseminate information to
market operation centers? - CORRECT ANSWER -all call



Real time bus prices may be monitored using.... - CORRECT ANSWER -Data viewer


Which of the following actions is a violation of PJM two settlement market rules? - CORRECT
ANSWER -not offering an available PJM capacity resource into the day ahead market


A unit that fails to start when scheduled, would be classified as which of the following types of
outage? - CORRECT ANSWER -unplanned outage


Maximum generation emergency is declared by PJM when which of the following occurs? -
CORRECT ANSWER -generation is required above the highest incremental economic
system cost


Maintenance outages are permitted when - CORRECT ANSWER -a unit can be held
online until the following Monday, and system reliability is not affected.

Document information

Uploaded on
July 26, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions