Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 32 pages
Exam (elaborations)

PJM Transmission Exam Study UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 4 out of 32 pages

PJM Transmission Exam Study UPDATED ACTUAL Exam Questions and CORRECT Answers During System Restoration, what is the optimal Frequency Range? - CORRECT ANSWER -59.75 - 61 Hz The 500 kV system has normal bus voltages between? - CORRECT ANSWER kV When Connecting 2 islands, the operator must match? - CORRECT ANSWER Phase Angle and Frequency -500 to 550 -Voltage,

Content preview

PJM Transmission Exam Study UPDATED
ACTUAL Exam Questions and CORRECT
Answers
During System Restoration, what is the optimal Frequency Range? - CORRECT
ANSWER -59.75 - 61 Hz



The 500 kV system has normal bus voltages between? - CORRECT ANSWER -500 to 550
kV


When Connecting 2 islands, the operator must match? - CORRECT ANSWER -Voltage,
Phase Angle and Frequency


What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) -
CORRECT ANSWER -30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of
energized 500 kV


When will PJM issue a Minimum Generation Alert? (how many MW under normal operating
limits) - CORRECT ANSWER -When expected generation levels fall within 2500 MW of
normal operating limits


When a thunderstorm is nearing the BES should auto-reclosing be turned on? - CORRECT
ANSWER -Yes



What does SCADA stand for? - CORRECT ANSWER -Supervisory Control & Data
Acquisition


What does IROL stand for? - CORRECT ANSWER -Interconnection Reliability
Operating Limit

,What does eDART stand for? - CORRECT ANSWER -Dispatcher Application and
Reporting Tool


What is eDART used for? (Electronic Disp Reporting Tool) - CORRECT ANSWER -It is
used for: Generation Outage Scheduling, Instantaneous Reserve Checks, Generator Reactive
Capabilities and to enter and submit switching


What direction do VARS flow? - CORRECT ANSWER -From HIGH Voltage to LOW
Voltage


What direction do MW flow? - CORRECT ANSWER -From HIGH Phase Angle to LOW
Phase Angle


Which of the following factors are NOT used in forecasting load?


1) Weather Forecast
2) Historical Load Forecast
3) Historical Weather Data

4) Locational Marginal Pricing (LMP) Data - CORRECT ANSWER -4


What one-way communication system is used to disseminate info to local call centers? -
CORRECT ANSWER -All-Call


The 3 categories of messages issued by PJM All-Call all EXCEPT:


1) Operational
2) Informational
3) Conflicting Interchange Values

4) Emergency Procedures - CORRECT ANSWER -3

,When should, transmission outages should be submitted to PJM to avoid cancellation and to be
considered "on time?' - CORRECT ANSWER -First day of Month Prior to the Outage


What report will be requested by PJM when a Max Generation Alert is issued? - CORRECT
ANSWER -Supplementary Status Report (SSR)


The loss of a large generation unit on the PJM system can be detected by monitoring: -
CORRECT ANSWER -Frequency and PJM Area Control Error (ACE)


The PJM system is operated such that the contingency flow is less than the: - CORRECT
ANSWER -Emergency Rating



When ordered a 5% voltage reduction should be taken on: - CORRECT ANSWER -The
Distribution System


TOs are required to report "Hot Line Work" on what voltage levels? - CORRECT
ANSWER -345 kV and Above



Load dump rating of an EHV line is determined by? - CORRECT ANSWER -115% of the
facility's 4 hour Emergency Rating


During System Restoration, will closing additional tie lines increase the strength & stability of an
interconnected area? - CORRECT ANSWER -Yes


Which of the following factors influence load forecast (3)?


1) Weather
2) Temperature
3) Reactive Reserves

4) Day of the week - CORRECT ANSWER -1, 2, 4

, During system restoration, what is the voltage range the system should be kept between? -
CORRECT ANSWER -90% and 105% maintain voltage profile between for system
restoration


PJM will coordinate and direct all restoration lines of what voltage levels? - CORRECT
ANSWER -500kV and above


How much load would you dump to increase the frequency by 1 Hz (percentage range)? -
CORRECT ANSWER -6-10%



Generation is disconnected after 5 seconds, when the frequency: - CORRECT ANSWER -
Drops below 57.5Hz


How much of the total Dynamic Reserve should be used on Under Frequency relay load? -
CORRECT ANSWER -


During System Restoration, capacitor banks should be kept off until how much of the load is
restored? - CORRECT ANSWER -40%


Would PJM assume Frequency Control when the control of an interconnected area is too
burdensome for any Local Control Center? - CORRECT ANSWER -Yes


Operator receiving an All-Call message should state the following before playback of the
message? - CORRECT ANSWER -Name and Company



Dynamic Reserves consist of: - CORRECT ANSWER -Governor Reserve and Load that
has been restored with under frequency relays


What would be the appropriate response to receiving a DC ground Alarm? - CORRECT
ANSWER -Advise substation personnel of the alarm during normal hours

Document information

Uploaded on
July 26, 2025
Number of pages
32
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions