Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

NCIDQ – FINAL EXAM 2025 QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 2 out of 12 pages

The BEST way to avoid fabric slippage over a cushion would be to specify - ANS Channeling The full extent of slab-to-slab partitions on a project is best shown on - ANS reflected ceiling plan Interior construction drawing sets are generally organized by which of the following sequences? - ANS floor plans, reflected ceiling plans, elevations, details, electrical plans Dimensions on interior design floor plans are commonly drawn from the... - ANS finish faces of partitions Drawings for a single floor in a high-rise building containing commercial office spaces would MOST likely use what form of sheet notation? - ANS A23.1, A23.2, A23.3, A23.4, and so on An interior designer has drawn a floor plan of a large office space to a scale of 1/8 in - 1 ft 0 in (1:100) and determines that an enlarged floor plan to the toilet rooms needs to be included. What information should be shown on the enlarged floor plan that is not shown on the small- scale plans? Choose four that apply. - ANS Dimensions to centerlines of fixtures, dimensions to walls within the toilet rooms, dimensions of toilet partitions, toilet accessories with a key to to a schedule. An interior designer is developing a floor plan for a new tenant in an existing office space and will reuse a number of existing partition to meet LEED reusability requirements. What notation should the interior designer use on the demolition plan to clearly distinguish partitions to be NCIDQ – FINAL EXAM 2025 QUESTIONS AND ANSWERS 2 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED removed from partitions to be reused? - ANS Dashed lines for partitions being removed and solid lines for partitions being reused. Which of the following information about gypsum wallboard partitions should be part of a project's specifications, not its drawings? - ANS Fastener Spacing Which of the following schedules are MOST likely to be found on a set of interior design drawings? Choose four that apply. - ANS Luminaire schedule, door schedule, equipment schedule, millwork schedule. Refer to the illustration, which shows a reflected ceiling plan for an office space (do not use the ceiling grid as scale). What is the maximum spacing of the sprinkler heads indicated by A and B, in accordance with National Fire Protection Association (NFPA) 13 for light hazard occupations? - ANS A = 7 1/2 ft, B = 15 ft (2286 mm, 4572 mm) What is illustrated in the following partial drawing? - ANS Floor plan Which of the following plans would show a property's buildings, walks, driveways, drainage paths, and utility locations? - ANS Site plan On a remodeling project with new construction, including partitions, a demolition plan is necessary when... - ANS There is a complete mix of items to be removed and new construction. What physical elements are indicated on a commercial reflected ceiling plan in addition to the ceiling construction itself? - ANS Items that are part of, touch, or go through the ceiling. A residential project with multiple finishes on a variety of wall and floor surfaces would BEST be specified usi

Content preview

NCIDQ – FINAL EXAM 2025 QUESTIONS
AND ANSWERS


The BEST way to avoid fabric slippage over a cushion would be to specify - ANS Channeling



The full extent of slab-to-slab partitions on a project is best shown on - ANS reflected ceiling
plan


Interior construction drawing sets are generally organized by which of the following sequences?
- ANS floor plans, reflected ceiling plans, elevations, details, electrical plans



Dimensions on interior design floor plans are commonly drawn from the... - ANS finish faces
of partitions


Drawings for a single floor in a high-rise building containing commercial office spaces would
MOST likely use what form of sheet notation? - ANS A23.1, A23.2, A23.3, A23.4, and so on


An interior designer has drawn a floor plan of a large office space to a scale of 1/8 in - 1 ft 0 in
(1:100) and determines that an enlarged floor plan to the toilet rooms needs to be included.
What information should be shown on the enlarged floor plan that is not shown on the small-
scale plans? Choose four that apply. - ANS Dimensions to centerlines of fixtures, dimensions
to walls within the toilet rooms, dimensions of toilet partitions, toilet accessories with a key to
to a schedule.


An interior designer is developing a floor plan for a new tenant in an existing office space and
will reuse a number of existing partition to meet LEED reusability requirements. What notation
should the interior designer use on the demolition plan to clearly distinguish partitions to be

1 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED

, removed from partitions to be reused? - ANS Dashed lines for partitions being removed and
solid lines for partitions being reused.


Which of the following information about gypsum wallboard partitions should be part of a
project's specifications, not its drawings? - ANS Fastener Spacing


Which of the following schedules are MOST likely to be found on a set of interior design
drawings? Choose four that apply. - ANS Luminaire schedule, door schedule, equipment
schedule, millwork schedule.


Refer to the illustration, which shows a reflected ceiling plan for an office space (do not use the
ceiling grid as scale). What is the maximum spacing of the sprinkler heads indicated by A and B,
in accordance with National Fire Protection Association (NFPA) 13 for light hazard occupations?
- ANS A = 7 1/2 ft, B = 15 ft (2286 mm, 4572 mm)



What is illustrated in the following partial drawing? - ANS Floor plan


Which of the following plans would show a property's buildings, walks, driveways, drainage
paths, and utility locations? - ANS Site plan


On a remodeling project with new construction, including partitions, a demolition plan is
necessary when... - ANS There is a complete mix of items to be removed and new
construction.


What physical elements are indicated on a commercial reflected ceiling plan in addition to the
ceiling construction itself? - ANS Items that are part of, touch, or go through the ceiling.


A residential project with multiple finishes on a variety of wall and floor surfaces would BEST be
specified using... - ANS a finish plan with elevations indicated.




2 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED

Document information

Uploaded on
July 26, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
sirjoel
3.6
(18)
Sold
133
Followers
13
Items
12780
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions