Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

NCIDQ - IDFX - PRACTICE TEST 1 EXAM 2025 QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 2 out of 5 pages

At what stage would a building analysis be conducted for an existing multi-story structure that is being renovated and converted from office use to school use? a. schematics b. master planning c. code analysis d. programming - ANS programming which of the following is the MOST important consideration in planning for a small open office project? a. management of overall cost per square foot b. specification of appropriate materials and finishes c. maintaining ratio between circulation and work area d. support of job function and relationships - ANS support of job function and relationships what is an appropriate circulation factor for an open office plan using systems furniture? a. 5%-8%. b. 10%-20%. c. 25%-40%. d. 50%-65% - ANS 25%-40% which measurement is an acceptable height for a barrier-free shower seat? a.14" b.15" c. 18" 3. 20" - ANS 18" A client would like to install a window in a 60 min rated door in a corridor. Which of the following would be acceptable? a. 10" x 10" wired glass. b. 6" x 12" wired glass. c. 10" x 10" tempered glass. d. 6" x 12" tempered glass

Content preview

NCIDQ - IDFX - PRACTICE TEST 1
EXAM 2025 QUESTIONS AND ANSWERS


At what stage would a building analysis be conducted for an existing multi-story structure that
is being renovated and converted from office use to school use?

a. schematics b. master planning c. code analysis d. programming - ANS programming


which of the following is the MOST important consideration in planning for a small open office
project?
a. management of overall cost per square foot
b. specification of appropriate materials and finishes
c. maintaining ratio between circulation and work area

d. support of job function and relationships - ANS support of job function and relationships


what is an appropriate circulation factor for an open office plan using systems furniture?

a. 5%-8%. b. 10%-20%. c. 25%-40%. d. 50%-65% - ANS 25%-40%


which measurement is an acceptable height for a barrier-free shower seat?

a.14" b.15" c. 18" 3. 20" - ANS 18"


A client would like to install a window in a 60 min rated door in a corridor. Which of the
following would be acceptable?
a. 10" x 10" wired glass. b. 6" x 12" wired glass. c. 10" x 10" tempered glass. d. 6" x 12"
tempered glass - ANS 10" x 10" wired glass


1 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED

, when converting a 5 bedroom beach house into a bed and breakfast facility, where would a
smoke alarm be required?
a. in the kitchen if its under a sleeping room
b. in the manager's office
c. in each sleeping room

d. outside any shared bathrooms - ANS in each sleeping room


what light and color characteristics would be MOST effective to enhance way-finding in a senior
living facility?

a. brightness b. hue c. contrast. d. saturation - ANS contrast


when selecting a floor tile for a locker room with a shower, what is the primary consideration?
a. long-term maintenance
b. installation method
c. dynamic coefficient of friction

d. product density - ANS dynamic coefficient of friction


which of the following documents are MOST likely to be included in the design development
package?
a. technical drawings, schedules, and specifications required to price, build and install work.
b. any documents required to communicate compliance with applicable codes to local
authorities responsible for issuance of permits.
c. technical drawings, images, and samples communicating design intent and client
requirements
d. detailed floor plans, ceiling plans, elevations, sections, design details, millwork drawings, and
material samples, and specifications - ANS detailed floor plans, ceiling plans, elevations,
sections, design details, millwork drawings, and material samples, and specifications


the term architectural woodwork refers to which of the following?

2 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED

Document information

Uploaded on
July 26, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
sirjoel
3.6
(18)
Sold
133
Followers
13
Items
12780
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions