1. The 1970's law that set into place the regulation of stormwater is:: The Clean
Water Act
2. Requirements for managing stormwater activity on a construction site are
outlined in the following regulation:: NPDES
3. Which of the following is never an allowable stormwater discharge from a
construction site?: Discharge from contaminated groundwater
4. The Notice of termination can filed when:: All construction activity, inside
and outside the building, is complete and permanent stabilization verified
5. Relative to stormwater permitting, all of the following must occur before
construction starts except:: Submit the notice of termination (NOT)
6. Which erosion control best mgmt practice increases water infiltration, dis-
sipates rainfall energy and slows overland flow of stormwater: Vegetation
7. Of the following factors that influence erosion rates, the one a contractor
has the most control over is:: Groundcover
8. Temporary stabilization should be implemented: Immediately on all
disturbed areas that are likely to or will remain inactive for 14-days or more
mailto:https://www.stuvia.com/user/Wisdoms
2025/2026 QUESTIONS AND 100%
CORRECT ANSWERS
1. The 1970's law that set into place the regulation of stormwater is:: The Clean
Water Act
2. Requirements for managing stormwater activity on a construction site are
outlined in the following regulation:: NPDES
3. Which of the following is never an allowable stormwater discharge from a
construction site?: Discharge from contaminated groundwater
4. The Notice of termination can filed when:: All construction activity, inside
and outside the building, is complete and permanent stabilization verified
5. Relative to stormwater permitting, all of the following must occur before
construction starts except:: Submit the notice of termination (NOT)
6. Which erosion control best mgmt practice increases water infiltration, dis-
sipates rainfall energy and slows overland flow of stormwater: Vegetation
7. Of the following factors that influence erosion rates, the one a contractor
has the most control over is:: Groundcover
8. Temporary stabilization should be implemented: Immediately on all
disturbed areas that are likely to or will remain inactive for 14-days or more