abnormal demand - ANSWER demand in any period that is outside the
limits established by management policy:
1. Not in the forecast
2. From a nonregular customer
3. Random, nonrecurring, highly variable
4. Not received through normal channels


actual demand - ANSWER made up of customer orders; consumes the
forecast, depending on rules chosen over a time horizon


adaptive smoothing - ANSWER form of exponential smoothing where the
smoothing constant is automatically adjusted as a function of forecast
error measurement


advanced planning and scheduling (APS) - ANSWER techniques that deal
with analysis and planning of logistics and manufacturing during short,
intermediate, and long-term time periods; main components: (1)
demand planning, (2) production planning, (3) produc tion scheduling,
(4) distribution planning, and (5) transportation planning aggregate
forecast

,aggregate forecast - ANSWER estimate of sales for a grouping of
products or product families; used for sales and production planning


aggregate plan - ANSWER plan that includes budgeted levels of finished
goods, inventory, production backlogs, and changes in the workforce to
support the production strategy; aggregated information is used


allocation - ANSWER classification of quantities of items that have been
assigned to specific orders but have not yet been released from the
stockroom to production; process used to distribute material in short
supply


alpha factor/smoothing constant - ANSWER weighting factor used in
exponential smoothing; applied to the most recent demand,
observation, or error (error = actual demand - forecast); range is 0 to 1


base series - ANSWER standard succession of values of demand-over-
time data used in forecasting seasonal items; based on relative level of
demand during the corresponding period of previous years (average
value = 1, >1 is over average demand, <1 is under average demand)


benchmarking - ANSWER comparing a company's costs, products, and
services to that of a company thought to have superior performance
types: (1) competitive (2) financial (3) functional (4) performance (5)
process (6) product (7) strategic

,bill of distribution/distribution network structure - ANSWER shows the
dependencies between stocking locations at multilevel of distribution
network


bill of resources/bill of capacity - ANSWER listing of the required
capacity and key resources needed to manufacture one unit of a
selected item or family; RCCP uses these bills to calculate the
approximate capacity requirements of the MPS


bottom-up replanning - ANSWER (in MRP) process of using pegging data
to solve material availability or other problems performed by the
planner; solutions include compressing lead time, cutting order quantity,
substituting material, and changing the MPS


bucketed system - ANSWER (in MRP, DRP or other time=phased system)
all time-phased data are accumulated into time periods, i.e. buckets


bucketless system - ANSWER (in MRP, DRP or other time-phased system)
time-phased data are processed, stored, and displayed using data
records rather than defined time periods


by-product - ANSWER material of value produced as a residual of or
incidental to the production process


capable-to-promise (CTP) - ANSWER process of committing orders
against available capacity and inventory; used to determine when a new
or unscheduled customer order can be delivered; employees finite
scheduling model of the manufacturing system and includes constraints

, capacity planning using overall factors (CPOF) - ANSWER RCCP
technique; master schedule items and quantities are multiplied by the
total time required to build each item to provide total number of hours
to produce the schedule; historical work center percentages are applied
to the total hours to provide estimate of hours per work center required


cash-to-cash cycle time - ANSWER indicator of how efficiently a company
manages its assets to improve cash flow


= inventory days + accounts receivable days - accounts payable days


chase production method - ANSWER production planning method that
maintains a stable inventory level while varying production to meet
demand


collaborative planning, forecasting, and replenishment (CPFR) - ANSWER
collaboration process where supply chain trading partners jointly plan
key supply chain activities; includes business planning, sales forecasting,
and operations required to replenish raw materials and finished goods


common parts bill of material - ANSWER type of planning bill that groups
common components for a product/family of products into one bill of
material, structured to a pseudo-parent part number

Document information

Uploaded on
July 25, 2025
Number of pages
32
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Performance
4.3
(238)
Sold
546
Followers
45
Items
19465
Last sold
14 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions