• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

LMS Test Answers

Document preview thumbnail
Preview 2 out of 11 pages

Exam of 11 pages for the course LMS at LMS (LMS Test Answers)

Content preview

LMS Test Answers
Study online at https://quizlet.com/_fj3oca

1. Under what conditions is the min- 72
imum remaining runtime hours at
maximum capacity before a unit
considered Resource Limited?

2. For Price Based Units, which Price 79
price schedule must exist and be
marked as available?

3. What term is used to describe re- Secondary Reserves
serve MWs that are attainable be-
tween 10 minutes and 30 minutes
of a request?

4. How much notice must a genera- 20 minutes
tor give to PJM before coming on-
line?

5. What field is selected to calcu- Use Offer Slope
late the schedule's offer when dis-
patched between MW segments?

6. At a minimum, PJM will request an The peak load
IRC prior to which of the following
daily occurrences?

7. Name the two Regulation types Reg A and Reg D

8. Which of the following would Light loads, Switching in a line with high capacitive
most likely result in high voltages? charging current, Excessive VAR loading
Check all that apply:

9.



, LMS Test Answers
Study online at https://quizlet.com/_fj3oca

If a generating unit's governor Control the magnitude of governor response for a given
control has a droop characteristic, change in frequency
the unit will:

10. Which of the following changes re- Any change in unit output >= 50 MW
quires notification to PJM Dispatch
in real time operations?

11. Intra-day regulation updates can 65 minute prior to the beginning of the desired operat-
be made no later than ing hour ending

12. The daily default regulation offers 14:15 EPT the day before the operating day
must be submitted to PJM no later
than

13. Who determines voltage sched- Transmission Owners
ules at generator buses?

14. In addition to Operating Re- Secondary
serves, Synchronized Reserves,
and Quick Start Reserve,
_______________________ Reserves
are also included in the IRC report.

15. Operating Parameter character- Time variables
istics of each generator include
physical parameters, cost vari-
ables and

16. Energy offers for the Day Ahead 11:00
market for the next market day
evaluation must be submitted by
what time?

Document information

Uploaded on
July 24, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
waindigrace87
4.0
(2)
Sold
4
Followers
0
Items
1991
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions