Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

PJM Generation Dispatcher Exam Practice

Document preview thumbnail
Preview 2 out of 8 pages

PJM Generation Dispatcher Exam Practice

Content preview

PJM Generation Dispatcher Exam Practice
Study online at https://quizlet.com/_d0zy9w

1. An EXCITER on a traditional Voltage regulation (AVR) if you change the excitation current, you
generator does what? change the voltage.

2. ECO Min, ECO Max, and Limits
EMERG Max are genrator
_________________.

3. When synchronizing to the Frequency, Voltage, and phase angle.
interconnection, what needs
to be synchronized?

4. GMD (GeoMagnetic Distur- 10A or greater is measured by special equipment at Missouri
bance) procedure is imple- Ave or Meadowbrook and the measurement is confirmed by
mented when? one of the following other sources: Excess transformer current
@ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR
requirements on transformers @ Hopw Creek or Salem nuclear
subs, or high DC measurements @ Limerick or Peach Bottom.

5. What are the 2 types of Elevated and Imminent.
National Terrorism Advisory
Alerts?

6. What action does PJM take Conservative Operations
for a terrorist attack, fuel de-
livery emergency, or GMD's?

7. What does PJM put the most Operations and Communications
emphasis on during a terror-
ist/sabotage event?

8. What does PJM request dur- RRC - reactive reserve check
ing a low voltage alert?


1/8

, PJM Generation Dispatcher Exam Practice
Study online at https://quizlet.com/_d0zy9w

9. PJM issues a Heavy Load 4 hours
Voltage Warning how many
hours prior to implementa-
tion?

10. What should generation Operate at the lower bandwidth of the voltage schedule.
owners/operators do during
a High System Voltage Ac-
tion?

11. How many hours do you have 6 hours
to report a 24-hr reportable
NERC disturbance?

12. What report is generated SSR - Supplementary Status Report
during a Max Emergency Gen
Alert?

13. What part of the SSR is the Part G Resource Limited Units which are units that are not able
Fuel Limited Resources ac- to run at max capacity for more than 72 hours.
counted for?

14. What kind of Emergency Pro- Actions
cedures occur during real
time operating hours?

15. What is the per Unit (p.u.) for 348/345 = 1.008 pu
a 345 kV nominal voltage that
is currently at 348 kV?

16. What is the Emergency Re- Eco Min - Emerg Min = 25MW
ducible Generation (ERG) if


2/8

Document information

Uploaded on
July 24, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
waindigrace87
4.0
(2)
Sold
3
Followers
0
Items
1994
Last sold
3 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions