PJM Generation Dispatcher Exam Practice
Study online at https://quizlet.com/_d0zy9w
1. An EXCITER on a traditional Voltage regulation (AVR) if you change the excitation current, you
generator does what? change the voltage.
2. ECO Min, ECO Max, and Limits
EMERG Max are genrator
_________________.
3. When synchronizing to the Frequency, Voltage, and phase angle.
interconnection, what needs
to be synchronized?
4. GMD (GeoMagnetic Distur- 10A or greater is measured by special equipment at Missouri
bance) procedure is imple- Ave or Meadowbrook and the measurement is confirmed by
mented when? one of the following other sources: Excess transformer current
@ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR
requirements on transformers @ Hopw Creek or Salem nuclear
subs, or high DC measurements @ Limerick or Peach Bottom.
5. What are the 2 types of Elevated and Imminent.
National Terrorism Advisory
Alerts?
6. What action does PJM take Conservative Operations
for a terrorist attack, fuel de-
livery emergency, or GMD's?
7. What does PJM put the most Operations and Communications
emphasis on during a terror-
ist/sabotage event?
8. What does PJM request dur- RRC - reactive reserve check
ing a low voltage alert?
1/8
, PJM Generation Dispatcher Exam Practice
Study online at https://quizlet.com/_d0zy9w
9. PJM issues a Heavy Load 4 hours
Voltage Warning how many
hours prior to implementa-
tion?
10. What should generation Operate at the lower bandwidth of the voltage schedule.
owners/operators do during
a High System Voltage Ac-
tion?
11. How many hours do you have 6 hours
to report a 24-hr reportable
NERC disturbance?
12. What report is generated SSR - Supplementary Status Report
during a Max Emergency Gen
Alert?
13. What part of the SSR is the Part G Resource Limited Units which are units that are not able
Fuel Limited Resources ac- to run at max capacity for more than 72 hours.
counted for?
14. What kind of Emergency Pro- Actions
cedures occur during real
time operating hours?
15. What is the per Unit (p.u.) for 348/345 = 1.008 pu
a 345 kV nominal voltage that
is currently at 348 kV?
16. What is the Emergency Re- Eco Min - Emerg Min = 25MW
ducible Generation (ERG) if
2/8
Study online at https://quizlet.com/_d0zy9w
1. An EXCITER on a traditional Voltage regulation (AVR) if you change the excitation current, you
generator does what? change the voltage.
2. ECO Min, ECO Max, and Limits
EMERG Max are genrator
_________________.
3. When synchronizing to the Frequency, Voltage, and phase angle.
interconnection, what needs
to be synchronized?
4. GMD (GeoMagnetic Distur- 10A or greater is measured by special equipment at Missouri
bance) procedure is imple- Ave or Meadowbrook and the measurement is confirmed by
mented when? one of the following other sources: Excess transformer current
@ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR
requirements on transformers @ Hopw Creek or Salem nuclear
subs, or high DC measurements @ Limerick or Peach Bottom.
5. What are the 2 types of Elevated and Imminent.
National Terrorism Advisory
Alerts?
6. What action does PJM take Conservative Operations
for a terrorist attack, fuel de-
livery emergency, or GMD's?
7. What does PJM put the most Operations and Communications
emphasis on during a terror-
ist/sabotage event?
8. What does PJM request dur- RRC - reactive reserve check
ing a low voltage alert?
1/8
, PJM Generation Dispatcher Exam Practice
Study online at https://quizlet.com/_d0zy9w
9. PJM issues a Heavy Load 4 hours
Voltage Warning how many
hours prior to implementa-
tion?
10. What should generation Operate at the lower bandwidth of the voltage schedule.
owners/operators do during
a High System Voltage Ac-
tion?
11. How many hours do you have 6 hours
to report a 24-hr reportable
NERC disturbance?
12. What report is generated SSR - Supplementary Status Report
during a Max Emergency Gen
Alert?
13. What part of the SSR is the Part G Resource Limited Units which are units that are not able
Fuel Limited Resources ac- to run at max capacity for more than 72 hours.
counted for?
14. What kind of Emergency Pro- Actions
cedures occur during real
time operating hours?
15. What is the per Unit (p.u.) for 348/345 = 1.008 pu
a 345 kV nominal voltage that
is currently at 348 kV?
16. What is the Emergency Re- Eco Min - Emerg Min = 25MW
ducible Generation (ERG) if
2/8