Six Sigma Black Belt - Fundamentals of Lean
Six Sigma Questions with Answers (100%
Correct Answers)
PDCA
Ans: (Plan, Do, Check, Act)
an iterative four-step management
method used for the control and
continuous improvement of processes
and products
(Deming Circle)
TQM and ISO 9000
Ans: A management philosophy and a set of international standards designed to assist
international trade and help companies form efficient quality systems.
Baldrige Criteria for Performance Excellence
Ans: A standard of excellence; guidelines for establishing and evaluating a performance
management function.
Statistical Process Control (SPC)
Ans: A methodology for using control charts to monitor change.
Quality Circles
Ans: A method of involving employees and their supervisors in process and workflow
improvement.
© 2025 All rights reserved
Six Sigma Questions with Answers (100%
Correct Answers)
PDCA
Ans: (Plan, Do, Check, Act)
an iterative four-step management
method used for the control and
continuous improvement of processes
and products
(Deming Circle)
TQM and ISO 9000
Ans: A management philosophy and a set of international standards designed to assist
international trade and help companies form efficient quality systems.
Baldrige Criteria for Performance Excellence
Ans: A standard of excellence; guidelines for establishing and evaluating a performance
management function.
Statistical Process Control (SPC)
Ans: A methodology for using control charts to monitor change.
Quality Circles
Ans: A method of involving employees and their supervisors in process and workflow
improvement.
© 2025 All rights reserved