Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

PIPEFITTER EXAM 8 WITH QUESTIONS AND VERIFIED ANSWERS ||ALREADY GRADED A+|| LATEST UPDATE 2025/2026

Document preview thumbnail
Preview 3 out of 19 pages

PIPEFITTER EXAM 8 WITH QUESTIONS AND VERIFIED ANSWERS ||ALREADY GRADED A+|| LATEST UPDATE 2025/2026

Content preview

PIPEFITTER EXAM 8 WITH QUESTIONS AND VERIFIED ANSWERS
pipefitter exam 8
||ALREADY GRADED A+|| LATEST UPDATE 2025/2026
Study online at https://quizlet.com/_he3ei3

1. what is the take out of a 10" short radius weld 90 elbow 10"

2. acetylene bottles have fusible link that melts at what 220 degrees or 212 best
temp answer

3. what is the pressure inside of oxygen cylinder 2000lbs/2500lbs

4. where the tags for ox bottles are located the shoulder of the bottle

5. which direction does a hacksaw blade cut forward

6. what tubing bend is used in installation of pipe hickey

7. when handling a newly threaded piece of pipe you sharp
must be careful because its

8. what is the purpose of the foot pedal on a pipe thread- safety
ing machine

9. when welding socket weld fittings what is the process shoulder all the way then
remove 1/16 from shoul-
der and tack weld

10. which code governs the installation of process piping B31.3

11. which valve is not appropriate as a boiler steam outlet ball valve
valve on high pressure boilers

12. who is responsible to qualify a welder employer

13. what temperature does an oxy cutting torch run at 5438 or 6630

14. which stamp is required for the assembly of high pres- "A" stamp
sure boilers



, pipefitter exam 8
Study online at https://quizlet.com/_he3ei3

15. high pressure pipe welding and welder must be qual- 9
ified to section ______ of the ASME code

16. what welding position is commonly used for welding 6G
test that will qualify you for all positions

17. what is the hardest welding position to use 6

18. a stop valve and check valve are installed in the feed water line

19. when piping up a low water cut off device to a boiler, no lower than the visible
the device must be piped to what height in relation to part of the gauge glass
the level of the gauge glass

20. what is the minimum size of the drain pipe and the 3/4'
blow valve required on a low water cut off that has a
seperate float chamber

21. the valve that offers the least resistance to flow us the gate
____ valve

22. what type of fitting must be placed in the water piping cross tee fitting
connection at every angfle to facilitate cleaning and
inspection of a water column or low water cut off

23. which way should the pressure excerpt on the globe below
valve seats

24. when should you change the packing on a valve with never
pressure behind it

25. what does the packing nut prevent from leaking the valve stem

26. 1/2"



, pipefitter exam 8
Study online at https://quizlet.com/_he3ei3

hanger rods supporting pipe 2 1/2" nps and larger
shall not be less than what diameter

27. a water column piped to a high pressure boiler shall 1"
be piped with a minimum size connection of

28. when piping up a boiler gauge glass to a water tube 2"
boiler, the lowest visible part of the water gauge glass
shall be at least how many inches above permissable
water level

29. a slow opening valve requires how many complete 5
turns to be opened or closed

30. the ASME power piping code B31.1 limits the size of 3"
ansi class 600 socket weld flanges for use in boiler
external piping, what is the maximum size limitation

31. cast iron pipe can be used to carry steam at what 250 psig
pressure

32. when welding high pressure piping that is within "PP" stamp
boundaries known as boiler external piping, you must
have what type of asme stamp

33. what stamp is required for piping on high pressure "A" stamp
boilers

34. high pressure pipe welding and welders must be qual- 9
ified to which section of the ASME code

35. if a muffler is used on a safety valve, it shall have high temp water boiler
sufficient outlet area to prevent back pressure from safety relief valves
interfering with the proper operation and discharge

Document information

Uploaded on
July 20, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
322
Followers
0
Items
1988
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions