TEWLS 209 PART 3 EXAM
In order for ZMMRP3 producing the list of candidate materials for MRP Type evaluation,
which of the below criteria applies: - Correct Answers -None of the above
Transaction ______ Stock Overview is used to check the real-time stocks at plant level.
- Correct Answers –MMBE
ZMMEXCESS transaction offers three versions on the use of this transaction. What are
the version? Please select all correct answers. - Correct Answers -Simulation
Real Run
Zero Balance
ZMMRP3, Check MRP Type is performed to review the consumption history and if
necessary, make changes to the planning strategy. - Correct Answers -True
To review Consumption information for a specific material record, which tab in Material
Master are you accessing? - Correct Answers -Forecasting
Use ZMMAACY, Phase Out Materials to monitor materials for which the Acquisition
Advice Code (AAC) has changed to Y. - Correct Answers -True
In order for ZMMRP3 producing the list of candidate materials for MRP Type evaluation,
which of the below criteria applies: - Correct Answers -None of the above
Transaction ______ Stock Overview is used to check the real-time stocks at plant level.
- Correct Answers –MMBE
ZMMEXCESS transaction offers three versions on the use of this transaction. What are
the version? Please select all correct answers. - Correct Answers -Simulation
Real Run
Zero Balance
ZMMRP3, Check MRP Type is performed to review the consumption history and if
necessary, make changes to the planning strategy. - Correct Answers -True
To review Consumption information for a specific material record, which tab in Material
Master are you accessing? - Correct Answers -Forecasting
Use ZMMAACY, Phase Out Materials to monitor materials for which the Acquisition
Advice Code (AAC) has changed to Y. - Correct Answers -True