Exam (elaborations)

Dbia Practice Test 2025/2026 Questions With Answers Graded A+

Document preview thumbnail
Preview 3 out of 18 pages

DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Content preview

DBIA PRACTICE TEST 2025/2026
QUESTIONS WITH ANSWERS GRADED A+



1. Project cxDelivery cxSystem: cxHow cxteam cxmembers cxare cxorganized,
cxestablishes cxwhen cxparties cxengage, cxdetermines cxroles cxof cxparties,
cxand cxdetermines cxsequence cxof cxdesign, cxprocurement, cxand
cxconstruction cx(db, cxcmar, cxdbb)
2. Procurement cxMethod: cxhow cxteam cxmembers cxare cxselected cx(QBS,
cxbest cxvalue, cxlow cxprice, cxsole cxsource)
3. contracting cxapproach: cxhow cxteam cxmembers cxare cxpaid cx(fp,
cxgmp, cxcost cxreimburse- cxment, cxtarget cxprice, cxunit cxprice)
4. Design-Bid-Build cx(DBB): cxlinear, cxsequential cxprocess, cxA/E
cxselected cxon cxqualifi- cxcations, cxGC cxselected cxon cxlow cxprice,
cxdesign cxis cxfully cxcompleted cxwithout cxinput cxfrom cxGC, cxA/E
cxacting cxin cxowner's cxinterests, cxwith cxa cxhistorically cxstrong cxbond,
cxprocess cxis cxwell-established cxand cxunderstood
5. construction cxmanager cxat cxrisk: cxsimilar cxorg cxstructure cxto cxDBB,
cxconstruction cxman- cxager cxselected cxby cxQBS cxor cxbest cxvalue,
cxcontractor cxprovides cxprecon cxservices, cxnegotiated cxgmp cxcontracting
1/
cxg cxg



18

,cxapproach, cxopen cxbook cxestimating cxprocess, cxpotential cxto cxfast
cxtrack cxproject, cxconstruction cxcost cxdetermined cxbefore cxdesign
cxcompleted, cxpotential cxissues cxover cxwhat cxis cxreasonably cxinferable
cxfrom cxgmp cxdesign cxdocuments
6. Design-Build: cxThe cxowner cxcontracts cxwith cxone cxentity cx(a cxperson
cxor cxfirm) cxto cxprovide cxboth cxdesign cxand cxconstruction cxservices,
cxdesigner cxand cxcontractor cxhave cxa cxdirect cxcon- cxtractual
cxrelationship, cxselected cxby cxQBS cxor cxbest cxvalue, cxwide cxspectrum
cxof cxcontracting cxapproaches cxand cxorganizational cxstructures, cxsingle
cxpoint cxresponsibility, cxowner cxdoes cxnot cxmanage cxdesigner, cxowner
cxexposure cxto cxclaims cxis cxsignificantly cxreduced
7. engineer cxprocure cxconstruct cx(epc): cxsimilar cxto cxdesign cxbuild,
cxin cxindustrial cxand cxpower cxgeneration cxsectors, cxsystems cxand
cxperformance cxtesting cxare cxcentral cxto cxscope, cxcontractor cxwill
cxtypically cxperform cxengineering cxwith cxits cxin-house cxstaff, cxowner cxhas
cxneed cxfor cxsingle cxpoint cxresponsibility, cxcontracts cxinclude cxplant
cxand cxprocess cxperformance cxguarantees, cxcontract cxitems cxinclude
cxperformance cxand cxschedule cxliquidated cxdamages cxand cxlimitations
cxof cxliability
8. Multiple cxPrime cxContracting: cxowner cxcontracts cxwith cxmultiple
cxtrade cxcontractors, cxattributes cxare cxtypically cxsimilar cxto cxdbb, cxowner's
cxability cxto cxschedule cxand cxcoordinate cxthe cxwork
9. Integrated cxProject cxDelivery cx(IPD): cxmulti-party cxagreement cx- cxall
cxparties cxequal, cxQBS cxprocurement cxand cxtarget cxpricing cxcontract
cxapproach, cxprivate cxsector cxuse cx(limited cxat cxthis cxtime), cxkey:
cxowner's cxability cxto cxaccept cxrisk
10. public-private cxpartnership cx(p3): cxInstead cxof cxgovernment
cxbuilding cxand cxmain- cxtaining cxmajor cxinfrastructure cx(such cxas
cxhighway, cxwater cxtreatment cxplant), cxbuild cxand cxmaintenance cxis
cxoutsourced cxto cxa cxprivate cxcompany. cxOpposed cxby cxpublic cxsector
cxunions. cxthis cxis cxnot cxconsidered cxa cxdelivery cxsystem cxbut cxits
cxunderlying cxapproaches cxare cxdelivery cxsystems cxand cxtypically cxuse
cxDB. cxmultiple cxprocurement cxand cxcontracting cxapproaches



2/
cxg cxg



18

, 11. shift left: intense efforts to establish scope early in the process; drives early
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




team formation to include key trade subcontractors;can enable big decisions to be
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




made early, affect project outcomes at lowest cost, establish a need for co-location
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




and collaboration, and compress time during concurrent design and construction
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




12. traditionaldesignbuild: typicallytwo-phasebestvalueprocurementwithlump c
xg cx
g cxg cxg cxg cxg cxg cxg cxg




sum contract; owner defines project requirements and scope of prescriptive work;
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




use of performance-based technical requirements with limited prescriptive specifi-
cxg cxg cxg cxg cxg cxg cxg cxg cxg




cations
cxg




13. progressive design build: design and price are progressively developed after cxg cxg cxg cxg cxg cxg cxg cxg cxg




the design-builder is under contract;final project cost and schedule commitment is
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




not established as part of the selection process; two phases: preliminary services
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




and final design and construction services
cxg cxg cxg cxg cxg cxg




14. criteria documents: describe the end result cxg cxg cxg cxg cxg




15. bridging documents: prescribes how to achieve the end result cxg cxg cxg cxg cxg cxg cxg cxg




16. design bid build paradigm: prior to bidding, owner undertakes a process to cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




design the project and all of its details to 100% complete plans and specs. the
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




owner is therefore responsible for success or failure of details of the design, and
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




warrantsthesufficiencyofdesigntothecontractor.theowneristhereforeliabletothe
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




contractorforanygapsbetweenplansandspecificationsandowner'srequirements for
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




project performance
cxg cxg




17. design details responsibility: the owner should define its performance re- cxg cxg cxg cxg cxg cxg cxg cxg cxg




quirements and award the contract on the basis of preliminary design; this makes
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




the design-builder responsible for completing the design in accordance with the
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




owner's performance requirements.that also causes the design-builder to warrant
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




the sufficiency of the design to meet the owner's criteria and the sufficiency of the
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




design to subcontractors/suppliers that have no design responsibility
cxg cxg cxg cxg cxg cxg cxg cxg




18. uniformat: subdivides project by functional elements, focuses on systems and cxg cxg cxg cxg cxg cxg cxg cxg cxg




assemblies, useful for preliminary information and early design phases, aligns with
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




BIM models and conceptual estimating
cxg cxg cxg cxg cxg




19. masterformat: subdivides work by results/trades, focuses on building materials, cxg cxg cxg cxg cxg cxg cxg cxg




products, and activities, useful for detailed information during final design and
cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg cxg




construction phases, and aligns with detailed estimating
cxg cxg cxg cxg cxg cxg cxg




3/
cxg cxg



18

Document information

Uploaded on
July 19, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
47
Followers
4
Items
1167
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions