What grade license must the shift operator have where a chief engineer has charge of a
plant of 500 BHP? - Answer-2nd Class

An engineer with one year of actual boiler operating experience verified by affidavit
would be allowed to take an exam for - Answer-2nd Class

An engineer having an engineer license, with 3 years actual boiler operating experience
verified by one or more affidavits would be allowed to take an exam for? - Answer-1st
Class

What is meant by high pressure boiler? - Answer-Steam or other vapor in excess of 15
PSIG or a water or other liquid boiler in which the pressure exceeds 160 PSIG or a
temperature of 250 F

What would a special engineer's license allow you to operate? - Answer-High and Low
pressure boilers and their appurtenances of not more than 50 HP

A shift engineer in a high-pressure, high-temperature hot water plant of 500 BHP must
have a? - Answer-2nd class Grade A or B

What does NBIC stand for? - Answer-National Board Inspection Code

What is the definition of Operation? - Answer-on site act of manipulating, monitoring,
and testing of boilers and their appurtenances by a properly licensed engineer or an
apprentice under the direct supervision of the properly licensed engineer

What does remote monitoring mean? - Answer-act of viewing or overseeing the boiler or
plant operating parameters or conditions from a remote location

What does repair mean? - Answer-work necessary to restore a boiler or pressure vessel
to a safe and satisfactory working condition

What is the definition of a state boiler inspector? - Answer-national board commissioned
boiler inspector current chief grade A license

,When the boiler heating surface cannot be discerned, the Bhp shall be determined by
dividing the BTU input by __ - Answer-67,000

IAW the statutes of the State of Mn, each electric Bhp is equal to __ KW - Answer-10

A logbook must be maintained in the boiler room by the __ - Answer-Chief Engineer or
the operating engineer designee

The shift engineer of a high pressure boiler plant of over 200 hp must stay within __ of
the boiler room at all times during the shift - Answer-500 ft

A high pressure boiler must have two means of feedwater supply if it exceeds __ hp -
Answer-50

When used, a quick-opening blowdown valve must be located - Answer-nearest the
boiler

The minimum passing score for a Mn engineer's license exam is __ % - Answer-70

Licenses granted must be displayed in - Answer-A conspicuous place in the engine or
boiler room

For the purpose of the boiler and pressure vessels statutes, "a year" is considered to be
at least __ hrs - Answer-2000

Sensible heat is - Answer-Able to cause a change in temperature

Heat that brings about a change of state without causing a change in temperature is -
Answer-Called latent heat

In a boiler, heat is transferred from the burning fuel to the water by - Answer-
Convection, conduction, radiation

Convection is a method of heat transfer where the movement of the fluids is due solely
to the - Answer-Flow of fluids

Large high pressure utility boilers use - Answer-Balanced draft

When heat transfer occurs by travelling through metal, it is known as - Answer-
conduction

An example of the transfer of heat by radiation is - Answer-The heating effect of the sun
on the earth

The document governing boiler fittings and valves is the__ code - Answer-ASME
(American Society of Mechanical Engineers)

, The best method of testing a low-water fuel cutoff (LWCO) is to - Answer-Lower the
water level in the boiler to the level where the burner should cut out

Rules governing the construction of power boilers are set out in - Answer-ASME Code
Section I

A way to determine if a safety valve on a boiler has sufficient capacity is to - Answer-
Check with the ASME Code

An example of a non destructive test on a boiler is a __ test - Answer-tensile

The material used most frequently for piping is - Answer-Stainless steel

In a natural draft furnace, the amount of draft is affected by the - Answer-Height of the
stack

A check valve is a valve that - Answer-Allows flow in one direction only

Expansion bends or joints are installed in piping systems to - Answer-Allow for
expansion and contraction of the piping without causing damage


What is the maximum boiler horsepower you may take charge of on a chief engineer's
license? - Answer-Unlimited

A 1st class engineer may take charge of a boiler plant not to exceed - Answer-500
Boiler HorsePower

If you were to fail a chief engineer's exam, how long must you wait before you would be
allowed to take the test again - Answer-30 Days

What should be displayed in the boiler room? - Answer-Engineer's License and
Exemption or inspection certificates

A 2nd class engineer may take complete charge of a boiler plant not to exceed...? -
Answer-100 Boiler Horse Power

T/F When determining what engineers license will be needed, the total horsepower
connected to the common header is used - Answer-True

In a boiler plant where there are two 250 horsepower boilers using heating surface
connected to the same common header, what engineer's license would be required? -
Answer-1st Class Engineer

What shift engineer's license would be required for two 250 HP boilers using heating
surface connected to the same common header - Answer-1st Class

Document information

Uploaded on
July 18, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Perfectscorer
3.6
(75)
Sold
503
Followers
355
Items
9443
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions