this type of capacity planning typically involves such alternatives such as overtime,
personnel transfers, and alternative production routings.
- long range
- short range
- intermediate range
short range
t/f: capacity can be looked at as both resource inputs and products outputs
true
the capacity utilization rate is calculated as X/Y. what are X and Y respectively?
- capacity used, capacity not used
- excess capacity, best operating level
- best operating level, capacity used
- capacity used, best operating level
capacity used, best operating level
the output level where average unit cost is minimized is known as what?
- economies of scale
- best operating level
- diseconomies of scale
- capacity used
best operating level
t/f: when plant product becomes too large, economies of scale may occur
false
at some point, the size of a plant becomes too large and diseconomies of scale become a
problem. these diseconomies may surface in many different ways. which of the following
,are ways of diseconomies of scale might service. select all
- cost of internal transportation of raw materials and finished goods
- maintaining the demand required may require significant discounting
- inability of a single customer to purchase large quantities
- too many customers located to close to the plant
- maintenance required to keep a few large-capacity pieces of equipment operating
- cost of internal transportation of raw materials and finished goods
- maintaining the demand required may require significant discounting
- maintenance required to keep a few large-capacity pieces of equipment operating
which of the following can be used to operationalize the focused factory concept?
- plant within a plant
- flexible process
- flexible plant
- flexible worker
plant within a plant
capacity flexibility is achieved by using what. check all
- flexible parts
- flexible processes
- flexible workers
- flexible plants
- flexible processes
- flexible workers
- flexible plants
capacity in excess of expected demand is known as a what.
- capacity improvement
- capacity cushion
- capacity overload
- capacity addition
, capacity cushion
t/f: the presence of the customer in a service delivery system increases the volatility of
demand
true
the term that refers to the average number of customers that come to a facility during a
specific period of time is known as the
- service rate
- utilization
- arrival rate
- output rate
arrival rate
this type of capacity planning requires top management participation and approval
- long range
- intermediate range
- short range
long range
___ is an output that a system is capable of achieving over a period of time
capacity
t/f: the size of the plant may cause diseconomies of scale
true
list the steps, first to last, required to determine capacity requirement
- calculate equipment and labor requirements
- forecast to predict sales
- project labor and equipment availabilities
- forecast to predict sales
- calculate equipment and labor requirements
- project labor and equipment availabilities
VERIFIED ANSWERS!!
this type of capacity planning typically involves such alternatives such as overtime,
personnel transfers, and alternative production routings.
- long range
- short range
- intermediate range
short range
t/f: capacity can be looked at as both resource inputs and products outputs
true
the capacity utilization rate is calculated as X/Y. what are X and Y respectively?
- capacity used, capacity not used
- excess capacity, best operating level
- best operating level, capacity used
- capacity used, best operating level
capacity used, best operating level
the output level where average unit cost is minimized is known as what?
- economies of scale
- best operating level
- diseconomies of scale
- capacity used
best operating level
t/f: when plant product becomes too large, economies of scale may occur
false
at some point, the size of a plant becomes too large and diseconomies of scale become a
problem. these diseconomies may surface in many different ways. which of the following
,are ways of diseconomies of scale might service. select all
- cost of internal transportation of raw materials and finished goods
- maintaining the demand required may require significant discounting
- inability of a single customer to purchase large quantities
- too many customers located to close to the plant
- maintenance required to keep a few large-capacity pieces of equipment operating
- cost of internal transportation of raw materials and finished goods
- maintaining the demand required may require significant discounting
- maintenance required to keep a few large-capacity pieces of equipment operating
which of the following can be used to operationalize the focused factory concept?
- plant within a plant
- flexible process
- flexible plant
- flexible worker
plant within a plant
capacity flexibility is achieved by using what. check all
- flexible parts
- flexible processes
- flexible workers
- flexible plants
- flexible processes
- flexible workers
- flexible plants
capacity in excess of expected demand is known as a what.
- capacity improvement
- capacity cushion
- capacity overload
- capacity addition
, capacity cushion
t/f: the presence of the customer in a service delivery system increases the volatility of
demand
true
the term that refers to the average number of customers that come to a facility during a
specific period of time is known as the
- service rate
- utilization
- arrival rate
- output rate
arrival rate
this type of capacity planning requires top management participation and approval
- long range
- intermediate range
- short range
long range
___ is an output that a system is capable of achieving over a period of time
capacity
t/f: the size of the plant may cause diseconomies of scale
true
list the steps, first to last, required to determine capacity requirement
- calculate equipment and labor requirements
- forecast to predict sales
- project labor and equipment availabilities
- forecast to predict sales
- calculate equipment and labor requirements
- project labor and equipment availabilities