Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 130 pages
Exam (elaborations)

Oregon Construction Contractors CCB Test Questions with complete solutions

Document preview thumbnail
Preview 4 out of 130 pages

Oregon Construction Contractors CCB Test Questions with complete solutions

Content preview

Oregon Construction Contractors CCB Test
Newest Questions and Answers
(Verified Answers)




1. A person who engages in a business or activity that construction new water
| | | | | | | | | | | |




| wells must possess a license from the
| | | | | |




Answer> Oregon Water Resource Department (OWRD)
| | | | |




2. True or False | |




Prompt billing and prompt collections make for a healthier cash flow.
| | | | | | | | | |




Answer> True |




3. Oregon OSHA consultantsWILL NOT | | | |




Answer> Issue citations or propose penalties for violations of OSHA standards.
| | | | | | | | | |




4. 1) Questions to answer when preparing your project schedule include all of
| | | | | | | | | | |




1 |/ |130

,| these except |




- All of these are questions to ask
| | | | | |




- What equipment will be needed?
| | | |




- How long will each task take to complete?
| | | | | | |




- What type of crew will be needed to complete the activity?
| | | | | | | | | |




Answer> - All of these are questions to ask
| | | | | | | |




- What equipment will be needed?
| | | |




- How long will each task take to complete?
| | | | | | |




- What type of crew will be needed to complete the activity?
| | | | | | | | | |




5. For Notice of Right Lien purpose, a commercial improvement is defined as
| | | | | | | | | | |




Answer> A structure that is not used or intended for use as a residential building
| | | | | | | | | | | | | |




6. I am the residential original contractor and I provide labor and materials for the
| | | | | | | | | | | | |




| project.Who do I need to give a notice of Right to Lien to?
| | | | | | | | | | | | |




Answer> Mortgagee |




7. A quantity survey is also referred to as a
| | | | | | | |




Answer> Take Off | |




2 |/ |130

,8. Tagout involves placing a warning tag
| | | | |




Answer> On an energy-isolation device | | | |




9. Other thanTake Off, other common construction estimate types include all,
| | | | | | | | | |




| except

Answer> Ballpark Estimates | |




10. True or False | |




An on-site of host employer is responsible for ensuring a safe place of
| | | | | | | | | | | |




| employment for leased or temporary workers. | | | | |




Answer> True |




11. The state unemployment tax rate varies base on
| | | | | | |




Answer> The history of unemploy- ment claims against the employer.
| | | | | | | | |




12. Stop work order violations can result in
| | | | | |




Answer> - Any of these could be the result of failure to comply with a stop work
| | | | | | | | | | | | | | | |




order.
|




- Court action|




- Permit or license revocation
| | |




- Civil penalties
|


3 |/ |130

, 13. The | gives an overview of the project,deadlines,and
| | | | | | |




| general requirements. |




Answer> Invitation to Bid | | |




14. "Job Logic" refers to | | |




Answer> The sequence of work | | | |




15. True or False | |




Self-employment taxes apply to all forms of business entities. | | | | | | | |




Answer> False |




16. - Money earned and money spent are accounted for in the year they are
| | | | | | | | | | | | |




| received or paid, respectively. | | |




Answer> In the Cash Method | | | |




17. The Itemized Summary is the basis for
| | | | | |




Answer> A complete and accurate estimate of project costs and lists all major items of
| | | | | | | | | | | | | |




|work in the order they are to be performed.
| | | | | | | |




18. A major difference between the EIN and the BIN is
| | | | | | | | |




Answer> One is federal and one is state| | | | | | |




4 |/ |130

Document information

Uploaded on
July 9, 2025
Number of pages
130
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$26.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip
4.1
(43)
Sold
277
Followers
6
Items
25801
Last sold
3 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions