Owner Builder Questions
What is a stair riser?
a. Height of a step
b. Sides of the stairs - Answer-a
What are thermal breaks? - Answer-materials or components used in construction to reduce or prevent
the transfer of heat between different parts of a building
What is the definition of an employer?
a. Company shareholder
b. Plumber
c. Prime Contractor - Answer-c
What is the correct order of priority when a site situation demands a Fall Policy?
a. Net, Guardrail, Fall Arrest, Other
b. Fall Restraint, Fall Arrest, Guardrail, Other
c. Guardrail, Fall Arrest, Fall Arrest, other
d. Gaurdrail, Fall Restraint, Fall Arrest, Work Procedures - Answer-d
What is FALSE about Electric meter installations? - Answer-There are several answers that are indeed
TRUE about meter installations. The correct answer as to what is FALSE is something to
the effect that they must not be within a meter or two of a Hydro meter.
, Which of the following is a physical marker or location used to establish on-site elevations?
a. Building corner
b. Benchmark
c. Survey point
d. Iron pin - Answer-b
What is the minimum number of screws required in exterior door hinges and strike plates, that
penetrate solid wood framing?
a. 4
b. 3
c. 2 with a minimum penetration of 25 mm into solid wood
d. 1 - Answer-c
What are H-clips used for?
a. To provide drainage
b. Space strapping
c. Support roof sheathing between rafters or trusses
d. Prevent ice dams - Answer-c
The performance of a specific task in a bar chart is referred to as
a. A schedule
b. An event
c. An activity
d. A process - Answer-c
What should be done with the topsoil on the job site?
What is a stair riser?
a. Height of a step
b. Sides of the stairs - Answer-a
What are thermal breaks? - Answer-materials or components used in construction to reduce or prevent
the transfer of heat between different parts of a building
What is the definition of an employer?
a. Company shareholder
b. Plumber
c. Prime Contractor - Answer-c
What is the correct order of priority when a site situation demands a Fall Policy?
a. Net, Guardrail, Fall Arrest, Other
b. Fall Restraint, Fall Arrest, Guardrail, Other
c. Guardrail, Fall Arrest, Fall Arrest, other
d. Gaurdrail, Fall Restraint, Fall Arrest, Work Procedures - Answer-d
What is FALSE about Electric meter installations? - Answer-There are several answers that are indeed
TRUE about meter installations. The correct answer as to what is FALSE is something to
the effect that they must not be within a meter or two of a Hydro meter.
, Which of the following is a physical marker or location used to establish on-site elevations?
a. Building corner
b. Benchmark
c. Survey point
d. Iron pin - Answer-b
What is the minimum number of screws required in exterior door hinges and strike plates, that
penetrate solid wood framing?
a. 4
b. 3
c. 2 with a minimum penetration of 25 mm into solid wood
d. 1 - Answer-c
What are H-clips used for?
a. To provide drainage
b. Space strapping
c. Support roof sheathing between rafters or trusses
d. Prevent ice dams - Answer-c
The performance of a specific task in a bar chart is referred to as
a. A schedule
b. An event
c. An activity
d. A process - Answer-c
What should be done with the topsoil on the job site?