Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

FDOT FINAL ESTIMATES - LEVEL 1 EXAM Q&A

Document preview thumbnail
Preview 1 out of 4 pages

FDOT FINAL ESTIMATES - LEVEL 1 EXAM Q&A Between Printings of the standard specifications, what does the department publish to identify and describe changes in the specifications? - Answer-Change Orders Completed sets of final plans should be: - Answer-Bound together in the order shown on the key sheet & Submitted to the district with the final estimates package. Which of the items listed below is NOT included in the Final Estimates package? - Answer-Density log books What is placed on the plan sheets to call particular attention to unusual conditions? - Answer-Plan Notes What would you use to document field changes in the plans? - Answer-Black ball point pen & Black pencil What is the basis for payment of final quantities? - Answer-Site Source records What software is available for calculation final pa quantities? - Answer-Engineering Menu According to the standard weight table, what is the TOTAL weight of the following quantities of bolts? - Answer-1,472 Ibs Which of the following documents are used for reviewing contract time charges before clearing estimates for final payment? - Answer-Construction Diaries It is usually necessary to measure items, which are to be paid for on a lump sum or "plan quantity" basis. - Answer-FALSE On the transmittal letter, how should field books be listed? - Answer-Book number & description of contents What is the rea of the sodded section shown below? - Answer-11,241 SY When a pay item is based on truck capacity and side boards have been added to the truck body, what should you submit with the final estimates package? - Answer-Sketches of truck measurements Examples of site source records include: - Answer-Field books, tally sheets asphalt reports, latitude & department While on aa metric project, what method would be used to document final measured items in the field for site source record documentation. - Answer-Use only metric measuring devices, no conversion is allowed What two types of Estimates are needed to pay for the work performed by contractors? - Answer-Final & Progress Monthly In case of discrepancies among the contract documents, which document takes the highest precedence? - Answer-Special Provisions Contractors Recieve progress payments on the basis of? - Answer-Monthly Progress Estimates

Content preview

FDOT FINAL ESTIMATES - LEVEL 1
EXAM Q&A
Between Printings of the standard specifications, what does the department publish to
identify and describe changes in the specifications? - Answer-Change Orders

Completed sets of final plans should be: - Answer-Bound together in the order shown
on the key sheet & Submitted to the district with the final estimates package.

Which of the items listed below is NOT included in the Final Estimates package? -
Answer-Density log books

What is placed on the plan sheets to call particular attention to unusual conditions? -
Answer-Plan Notes

What would you use to document field changes in the plans? - Answer-Black ball point
pen & Black pencil

What is the basis for payment of final quantities? - Answer-Site Source records

What software is available for calculation final pa quantities? - Answer-Engineering
Menu

According to the standard weight table, what is the TOTAL weight of the following
quantities of bolts? - Answer-1,472 Ibs

Which of the following documents are used for reviewing contract time charges before
clearing estimates for final payment? - Answer-Construction Diaries

It is usually necessary to measure items, which are to be paid for on a lump sum or
"plan quantity" basis. - Answer-FALSE

On the transmittal letter, how should field books be listed? - Answer-Book number &
description of contents

What is the rea of the sodded section shown below? - Answer-11,241 SY

When a pay item is based on truck capacity and side boards have been added to the
truck body, what should you submit with the final estimates package? - Answer-
Sketches of truck measurements

Examples of site source records include: - Answer-Field books, tally sheets asphalt
reports, latitude & department

Document information

Uploaded on
July 9, 2025
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Freshy
3.6
(10)
Sold
62
Followers
4
Items
6982
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions