Answers
/. Descri and Purp of Existing Veg - Answer-temp or perm bmp desi to stab soil and
remove sups part from sheet flow runoff.
/.Object of Existing Veg - Answer-1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
/.Targ Pollut of Existing Veg - Answer-1) Sed
2) nutri
3) Hydro carb/ petrol prod
4) turbidity
/.Appli of Existing Veg - Answer-1) Areas within site where no const activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.
/.limitations of Existing Veg - Answer-1) arid and semi-arid regions may have little to no
veg to work with.
2) amount of veg that may be press may be limited by size of prop
3) limited access for maint
/.Implementation considerations for existing veg - Answer-1) existing veg should be
maint where ever possible
/.Existing veg: inspection - Answer-1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics
/.Existing veg: maint - Answer-1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
, 7) treat invasive and noxious species
/.existing veg :potentially associated - Answer-1) swales
2) riparian
/.Sched/Sequ: purp & descrip - Answer-Temp, procedural control that involves creating
a written plan to address neck bmps and sequencing of construct activities to mitigate
the erosive effects of wind,water and construct activities.
/.Sched/Sequ: object - Answer-1) site planning & management
2) erosion control
3) sediment control
/.Sched/Sequ: targeted pollutants - Answer-1) sediment
/.Sched/Sequ: applications - Answer-1) develop timetables for certain activities, paretic
during rainy season
/.Sched/Sequ: limit - Answer-1) not following ached
/.Sched/Sequ: impl consid - Answer-1) Develop timetables for certain activities
2) Writtien detail soil diet acti as well as bmps to control run off
3) Stabilize as soon as possible.
/.Sched/Sequ: inspect - Answer-1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.
/.Sched/Sequ: maintanence - Answer-1) modify ached of active when changes are
warranted
2) modify ached of active prior to rainy season to reflect updated bmp info
/.Sched/Sequ: potentially associated bmps - Answer-1) all bmps
/.Hydroseed: Des& purp - Answer-Temp or perm bmp designed to reduce erosion and
runoff by applying mix of seed, fert and stabilizing emulsion.
/.Hydroseed: object - Answer-1) erosion control
2) good housekeeping/ materials management
3) post construct management
/.Hydroseed: targeted pollut - Answer-1) sediment
2) nutrients
3) metals
4) ph
/.Hydroseed: imp consid - Answer-1) need adequate moisture