A project estimator is developing a cost estimate for construction of a new
diagnostic imaging wing. The projected costs are:
Fixed equipment installation charges $700,000
Site isolation $50,000
Annual utilities $425,000
Construction materials $1,200,000
Portable equipment $900,000
Annual depreciation $275,000
What are the expected contractor expenses? - correct answers 1,600,000
Which of the following contribute to typical general contractor fees:
1. Permit and inspection fees
2. General conditions
,3. Overhead and profit
4. Site condition assessment fees - correct answers 2, 3, and 4
Demand side management (DSM) programs are developed and offered to
organizations by energy providers to do which of the following during peak
service? - correct answers Provide emergency energy demand sources
When developing a preventive maintenance program, a facility manager
should ensure that an annual test is conducted on every required battery-
powered lighting system. This test should be run for NOT less than: - correct
answers 30 seconds
In existing facilities, doors that open onto exit corridors should have 1-3/4 inch
solid bonded wood core or be of construction that resists fire for NOT less
than: - correct answers 20 minutes
Total dissolved solids in a cooling tower are regulated by: - correct answers
Variable speed drive fans
What contracts requires a schedule of values when negotiating? - correct
answers Guaranteed maximum price
A project has a budget of $6,600,000. Planning and design fees are estimated
at $700,000 and construction expenses are estimated at $5,100,000. What is
the amount of a 10% construction contingency? - correct answers 580,000
The Joint Commission standards require that an organization develop and
implement a policy to prohibit smoking except in specified circumstances. The
standard is intended to reduce risks of:
, 1. Possible adverse effects on care, treatment, and services to people who
smoke
2. Passive smoke to others
3. Fire
4. False alarms - correct answers 2, 3, and 4
When planning demolition, construction, or renovation, an organization selects
and implements proper controls to reduce risk and minimize the impact of
these activities on infection control. Which of the following are proper controls
within the construction area:
1. Providing negative air machines
2. Installing dust barriers
3. Wet-mopping the floors
4. Ensuring debris-free job site - correct answers 2, 3, and 4
A facility is installing an air intake for a medical air compressor. What is the
minimum heights, in ft., at which this should be located above the ground? -
correct answers 5