ACG CxA Test Questions Well Answered Graded A+ 1. Owner 2. End user 3. architect 4. electrical engineer 5. mechanical engineer 6. commissioning authority 7. controls contractor 8. mechanical contractor 9. electrical contractor 10. sheet metal contractor 11. TAB agency 12. General or construction manager 13. owners O&M staff - Answers Identify typical team member of the Cx Team. 1. commissioning starts at the inception of a building project during the pre-design phase, and continues through the post-acceptance phase. 2. provides an opportunity to cultivate a quality management focus among all design and construction team members as they become involved with the project - Answers Comprehensive Commissioning Chapter 5 - Answers Which Chapter of the ACG guideline identifies detailed methodology for Comprehensive HVAC Commissioning? Pre-design Design Construction Acceptance Post Acceptance - Answers What are the Comprehensive Commissioning phases? 1. Commissioning established as integral part of project 2. The owner selects the commissioning authority 3. Develop the scope of commissioning 4. Commissioning authority reviews design intent document - Answers Comprehensive Commissioning: Pre-design phase 1. Review design to ensure it accommodates commissioning 2. Write commissioning specifications defining contractor responsibilities 3. Commissioning authority writes the commissioning plan 4. Establish the project schedule - Answers Comprehensive Commissioning Design phase 1. Commissioning authority reviews contractor submittals 2. Commissioning authority updates commissioning plan 3. Commissioning process is coordinated—through project schedule, commissioning plan and commissioning plan and commissioning meetings 4. Carry out and document system verification checks 5. Carry out the document equipment and system start-ups 6. TAB agency completes and documents TAB work - Answers Comprehensive Commissioning Construction phase 1. Carry out FPTs on all HVAC systems 2. Train the O&M staff for effective, ongoing operations and maintenance of all systems 3. Provide full documentation - Answers Comprehensive Commissioning Acceptance phase 1. Correct any deficiencies, carry out required re-testing 2. Carry out any required "off-season" tests 3. Update documentation as required - Answers Comprehensive Commissioning Post-Acceptance phase - Answers Identify the Comprehensive HVAC commissioning organizational structure for Plan &

Content preview

ACG CxA Test Questions Well Answered Graded A+



1. Owner

2. End user

3. architect

4. electrical engineer

5. mechanical engineer

6. commissioning authority

7. controls contractor

8. mechanical contractor

9. electrical contractor

10. sheet metal contractor

11. TAB agency

12. General or construction manager

13. owners O&M staff - Answers Identify typical team member of the Cx Team.

1. commissioning starts at the inception of a building project during the pre-design phase, and continues
through the post-acceptance phase.

2. provides an opportunity to cultivate a quality management focus among all design and construction
team members as they become involved with the project - Answers Comprehensive Commissioning

Chapter 5 - Answers Which Chapter of the ACG guideline identifies detailed methodology for
Comprehensive HVAC Commissioning?

Pre-design

Design

Construction

Acceptance

Post Acceptance - Answers What are the Comprehensive Commissioning phases?

1. Commissioning established as integral part of project

, 2. The owner selects the commissioning authority

3. Develop the scope of commissioning

4. Commissioning authority reviews design intent document - Answers Comprehensive Commissioning:
Pre-design phase

1. Review design to ensure it accommodates commissioning

2. Write commissioning specifications defining contractor

responsibilities

3. Commissioning authority writes the commissioning plan

4. Establish the project schedule - Answers Comprehensive Commissioning Design phase

1. Commissioning authority reviews contractor submittals

2. Commissioning authority updates commissioning plan

3. Commissioning process is coordinated—through project

schedule, commissioning plan and commissioning plan

and commissioning meetings

4. Carry out and document system verification checks

5. Carry out the document equipment and system start-ups

6. TAB agency completes and documents TAB work - Answers Comprehensive Commissioning
Construction phase

1. Carry out FPTs on all HVAC systems

2. Train the O&M staff for effective, ongoing operations and maintenance of all systems

3. Provide full documentation - Answers Comprehensive Commissioning Acceptance phase

1. Correct any deficiencies, carry out required re-testing

2. Carry out any required "off-season" tests

3. Update documentation as required - Answers Comprehensive Commissioning Post-Acceptance phase

- Answers Identify the Comprehensive HVAC commissioning organizational structure for Plan & Spec

1. Authority leads the commissioning process, and works

Document information

Uploaded on
July 4, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.5
(75)
Sold
491
Followers
16
Items
32822
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions