NICET LEVEL 1 ITM OF WATER BASED
SYSTEMS EXAM WITH VERIFIED
SOLUTIONS
What pis pa ppurpose pof pa pcontrol pvalve p- pcorrect panswers p-Control pFlow pto pwater
pbased pfire pprotection psystem
The pgauge pon pthe pquick popening pdevice pshall pindicate p_____ pas pcompared pto
pthe pgauge pon pthe psystem pside pof pthe pdry ppipe pvalve? p- pcorrect panswers p-the
psame ppressure
What ptype pof ptest pshall pbe pprovided pwhen pa pvalve pis preturned pto pservice pto
pdetermine pthat pthe pvalve pis popen? p- pcorrect panswers p-Valve pstatus ptest
What pis pa pfire pservice pmain? p- pcorrect panswers p-A ppipe pand pits pappurtenances
pon pprivate pproperty/ pPipe pbetween pa psource pof pwater pand pthe pbase pof pthe
psystem priser
, Name pthe psystem pthat putilizes pa pplate pthrough pwhich pa ppasses pa pspecific
pamount pof pfoam pconcentrate pat pa pspecific ppressure. p- pcorrect panswers p-Orifice
pPlate pProportioning
During pan pinspection, pwhich pof pthe pfollowing pwould pbe pidentified pas pa psprinkler
pwhich pshall pbe preplaced? p- pcorrect panswers p-Corrosion
What pare pthe pinspection prequirements pfor phangers pand pseismic pbraces pinstalled
pin pconcealed pspaces? p- pcorrect panswers p-Periodic pinspection pis pnot prequired
Gauges pshall pbe preplaced pevery p_____yrs por ptested pevery p_____yrs pby
pcomparison pwith pa pcalibrated pgauge p- pcorrect panswers p-5 p/ p5
Where pair ppressure psupervision pis pconnected pto pa pconstantly pattended plocation
pgauges pshall pbe pinspected p______? p- pcorrect panswers p-Monthly
Sprinklers pinstalled pin pareas pthat pare pinaccessible pfor psafety pconsideration, pdue
pto pprocess poperations p____ pbe p____ pduring peach pscheduled pshutdown? p-
pcorrect panswers p-Shall/ pInspected
What ptype pof pvalve pis pdesigned pfor pthe ppurpose pof preducing pdownstream pwater
ppressure punder pboth presidual pand pstatic pconditions p- pcorrect panswers p-Pressure
preducing pvalve
PIV pand pOS&Y pshall pbe pbacked pa p__________ pturn pfrom pthe pfully popen
pposition pto pprevent pjamming. p- pcorrect panswers p-1/4
Gauges pnot paccurate pto pwithin p_______ ppercent pof pthe pfull pscale pshall pbe
precalibrated por preplaced? p- pcorrect panswers p-3
When pthere pis pa p_________ ppercent preduction pin pfull pflow ppressure, pwhen
pcompared pto poriginal pacceptance ptest, pthe pcause pof pthe preduction pshall pbe
pidentified pand pcorrected. p- pcorrect panswers p-10
An pinformational psign pshall pbe pplaced pat pthe p_______ psupplying pthe pantifreeze
ploop, pdry psystem, ppre paction psystem, por pauxiliary psystems pcontrol pvalve. p-
pcorrect panswers p-System pControl pRiser
Information psigns pshould pindicate pwhich pof pthe pfollowing? p- pcorrect panswers p-
Location pif pthe parea pserved pby psystem, pthe ppresence pand plocation pof pantifreeze
por pother pauxiliary psystems, pthe ppresence pand plocation pof pheat ptape
Which pof pthe pfollowing psigns prequire pa pquarterly pinspection pto pverify pthat pit pis
psecurely pattached pto pthe psprinkler priser? p- pcorrect panswers p-Hydraulic pDesign
pInformation psign
SYSTEMS EXAM WITH VERIFIED
SOLUTIONS
What pis pa ppurpose pof pa pcontrol pvalve p- pcorrect panswers p-Control pFlow pto pwater
pbased pfire pprotection psystem
The pgauge pon pthe pquick popening pdevice pshall pindicate p_____ pas pcompared pto
pthe pgauge pon pthe psystem pside pof pthe pdry ppipe pvalve? p- pcorrect panswers p-the
psame ppressure
What ptype pof ptest pshall pbe pprovided pwhen pa pvalve pis preturned pto pservice pto
pdetermine pthat pthe pvalve pis popen? p- pcorrect panswers p-Valve pstatus ptest
What pis pa pfire pservice pmain? p- pcorrect panswers p-A ppipe pand pits pappurtenances
pon pprivate pproperty/ pPipe pbetween pa psource pof pwater pand pthe pbase pof pthe
psystem priser
, Name pthe psystem pthat putilizes pa pplate pthrough pwhich pa ppasses pa pspecific
pamount pof pfoam pconcentrate pat pa pspecific ppressure. p- pcorrect panswers p-Orifice
pPlate pProportioning
During pan pinspection, pwhich pof pthe pfollowing pwould pbe pidentified pas pa psprinkler
pwhich pshall pbe preplaced? p- pcorrect panswers p-Corrosion
What pare pthe pinspection prequirements pfor phangers pand pseismic pbraces pinstalled
pin pconcealed pspaces? p- pcorrect panswers p-Periodic pinspection pis pnot prequired
Gauges pshall pbe preplaced pevery p_____yrs por ptested pevery p_____yrs pby
pcomparison pwith pa pcalibrated pgauge p- pcorrect panswers p-5 p/ p5
Where pair ppressure psupervision pis pconnected pto pa pconstantly pattended plocation
pgauges pshall pbe pinspected p______? p- pcorrect panswers p-Monthly
Sprinklers pinstalled pin pareas pthat pare pinaccessible pfor psafety pconsideration, pdue
pto pprocess poperations p____ pbe p____ pduring peach pscheduled pshutdown? p-
pcorrect panswers p-Shall/ pInspected
What ptype pof pvalve pis pdesigned pfor pthe ppurpose pof preducing pdownstream pwater
ppressure punder pboth presidual pand pstatic pconditions p- pcorrect panswers p-Pressure
preducing pvalve
PIV pand pOS&Y pshall pbe pbacked pa p__________ pturn pfrom pthe pfully popen
pposition pto pprevent pjamming. p- pcorrect panswers p-1/4
Gauges pnot paccurate pto pwithin p_______ ppercent pof pthe pfull pscale pshall pbe
precalibrated por preplaced? p- pcorrect panswers p-3
When pthere pis pa p_________ ppercent preduction pin pfull pflow ppressure, pwhen
pcompared pto poriginal pacceptance ptest, pthe pcause pof pthe preduction pshall pbe
pidentified pand pcorrected. p- pcorrect panswers p-10
An pinformational psign pshall pbe pplaced pat pthe p_______ psupplying pthe pantifreeze
ploop, pdry psystem, ppre paction psystem, por pauxiliary psystems pcontrol pvalve. p-
pcorrect panswers p-System pControl pRiser
Information psigns pshould pindicate pwhich pof pthe pfollowing? p- pcorrect panswers p-
Location pif pthe parea pserved pby psystem, pthe ppresence pand plocation pof pantifreeze
por pother pauxiliary psystems, pthe ppresence pand plocation pof pheat ptape
Which pof pthe pfollowing psigns prequire pa pquarterly pinspection pto pverify pthat pit pis
psecurely pattached pto pthe psprinkler priser? p- pcorrect panswers p-Hydraulic pDesign
pInformation psign