• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

U1 UST Installation/Retrofitting Exam Study Questions and Answers 2025

Document preview thumbnail
Preview 3 out of 19 pages

1. One of the significant causes of leaks in underground liquid storage systems is ____________ ________________ -Correct Answer Improper Installation 2. Written Plans are required to -Correct Answer obtain permits, solicit bids, and provide precise guidance for installers. 3. The plans should -Correct Answer Describe the property, identify the size and location of the tanks, indicate the liquids to be stored and provide the location of the dispensers and piping. 4. Storage systems discussed in this recommended practice are usually regulated by -Correct Answer Federal, state or local agencies. 5. All owners should ensure that the equipment to be installed meets -Correct Answer applicable regulatory requirements before being installed 6. Consult the local authorities who have jurisdiction in the area before storage-system plans are -Correct Answer finalized or construction is initiated. 7. All owners should ensure that the equipment to be installed meets all applicable regulatory requirements before -Correct Answer Being installed. 8. To avoid damage tanks must not be -Correct Answer dropped, dragged, or handled with sharp objects. 9. Tanks must not be dropped, dragged, or handled with sharp objects to avoid -Correct Answer Damage to the tank 10. The only time tanks really should be moved is when -Correct Answer for inspections and testing. 11. If a tanks is damaged at all throughout the moving process it must be -Correct Answer Repaired in accordance with the manufacture's instructions. 12. The proper way to move a tank is by lifting it, using the -Correct Answer Lift lugs that are installed by the manufacturer. 13. Tanks should be carefully lifted and lowered using -Correct Answer Cables or chains of adequate length. 14. When two lifting lugs are being used, the angle between the lifting cable and vertical should be no more than -Correct Answer 30 degrees. 15. Stockpile piping materials and equipment in a _____________ _________ on the job site -Correct Answer Secure area 16. Confirm adherence to specifications by reporting to the owner about any -Correct Answer detected damage that could result in leakage or premature corrosion. 17. Pressure test single-walled tanks with _____ to _______ psig air pressure, soaping all surfaces, seams and fittings while inspecting for bubbles. -Correct Answer 3 to 5 18. Air testing with over ___ psig (3 Psig for 12-Ft. Diameter FRP tanks) is hazardous and may damage the tank -Correct Answer 5 psig 19. Do not air test a tank that has previously contained -Correct Answer flammable or combustible liquids 20. Place ______ barricades at the ends of tanks being tested. -Correct Answer Warning 21. Avoid tank ends, man-ways, and fittings while the tank is under -Correct Answer Pressure 22. Release pressure in the tank before disconnecting any -Correct Answer gauges or test fittings. 23. Be aware some manufactures do not tighten fittings to allow for _____________ _____________ during shipping and storage. -Correct Answer Temperature changes

Content preview

U1 UST Installation/Retrofitting



U1 UST Installation/Retrofitting Exam Study
Questions and Answers 2025
1. One of the significant causes of leaks in underground liquid storage systems is
____________ ________________ -Correct Answer ✔Improper Installation

2. Written Plans are required to -Correct Answer ✔obtain permits, solicit bids, and
provide precise guidance for installers.

3. The plans should -Correct Answer ✔Describe the property, identify the size and
location of the tanks, indicate the liquids to be stored and provide the location of
the dispensers and piping.

4. Storage systems discussed in this recommended practice are usually regulated
by -Correct Answer ✔Federal, state or local agencies.

5. All owners should ensure that the equipment to be installed meets -Correct
Answer ✔applicable regulatory requirements before being installed

6. Consult the local authorities who have jurisdiction in the area before storage-
system plans are -Correct Answer ✔finalized or construction is initiated.

7. All owners should ensure that the equipment to be installed meets all applicable
regulatory requirements before -Correct Answer ✔Being installed.

8. To avoid damage tanks must not be -Correct Answer ✔dropped, dragged, or
handled with sharp objects.

9. Tanks must not be dropped, dragged, or handled with sharp objects to avoid -
Correct Answer ✔Damage to the tank

10. The only time tanks really should be moved is when -Correct Answer ✔for
inspections and testing.

11. If a tanks is damaged at all throughout the moving process it must be -Correct
Answer ✔Repaired in accordance with the manufacture's instructions.


U1 UST Installation/Retrofitting

,U1 UST Installation/Retrofitting


12. The proper way to move a tank is by lifting it, using the -Correct Answer ✔Lift
lugs that are installed by the manufacturer.

13. Tanks should be carefully lifted and lowered using -Correct Answer ✔Cables
or chains of adequate length.

14. When two lifting lugs are being used, the angle between the lifting cable and
vertical should be no more than -Correct Answer ✔30 degrees.

15. Stockpile piping materials and equipment in a _____________ _________ on
the job site -Correct Answer ✔Secure area

16. Confirm adherence to specifications by reporting to the owner about any -
Correct Answer ✔detected damage that could result in leakage or premature
corrosion.

17. Pressure test single-walled tanks with _____ to _______ psig air pressure,
soaping all surfaces, seams and fittings while inspecting for bubbles. -Correct
Answer ✔3 to 5

18. Air testing with over ___ psig (3 Psig for 12-Ft. Diameter FRP tanks) is
hazardous and may damage the tank -Correct Answer ✔5 psig

19. Do not air test a tank that has previously contained -Correct Answer
✔flammable or combustible liquids

20. Place ______ barricades at the ends of tanks being tested. -Correct Answer
✔Warning

21. Avoid tank ends, man-ways, and fittings while the tank is under -Correct
Answer ✔Pressure

22. Release pressure in the tank before disconnecting any -Correct Answer
✔gauges or test fittings.

23. Be aware some manufactures do not tighten fittings to allow for
_____________ _____________ during shipping and storage. -Correct Answer
✔Temperature changes


U1 UST Installation/Retrofitting

, U1 UST Installation/Retrofitting



24. True or False: Air tests are inconclusive without soaping and careful inspection
for bubbles? -Correct Answer ✔True

25. Tanks gauges must have a scale that will permit detection of small changes in
__________ that might go undetected on gauges with a ___________ _________.
-Correct Answer ✔Pressure, broader range.

26. Since the best accuracy of gauges is at mid-range, and test pressures must not
exeed 5 psig, use a gauge with a maximum limit of ____ or ______ -Correct
Answer ✔10 or 15 psig

27. Check the gauges __________ and _________ before use -Correct Answer
✔operation and accuracy

28. Underground storage systems may include vapor-recovery -Correct Answer
✔Piping and equipment

29. What can cause premature storage-system failures _________ -Correct Answer
✔Debris and other foreign materials

30. Tank installers should have gone through training programs to improve their
skills and insure the install is __________ -Correct Answer ✔Successful

31. __________ kinds of plans are required to obtain permits, solicit bids, and
provide precise guidance for installers -Correct Answer ✔written

32. ___________________ should insure that the equipment to be installed meets
all applicable regulatory requirements before beginning an installation -Correct
Answer ✔Owners

33. Tanks should be ___________ inspected before installation -Correct Answer
✔Visually

34. 2 Gauges should be used to reduce ___________ ____________ -Correct
Answer ✔gauge failure




U1 UST Installation/Retrofitting

Document information

Uploaded on
July 1, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PossibleA
3.9
(153)
Sold
1082
Followers
651
Items
14111
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions