SWR301 Final Quiz UPDATED
ACTUAL Exam Questions and
CORRECT Answers
Save
Terms in this set (47)
,How about a,b,c,d,e
estimating
project size and
effort from
requirements?
Based on
Select one or
more:
a. the number
of individually
testable
requirements
(Wilson 1995)
b. estimated
lines of code
needed to
implement
specific
requirements
c. story points
(Cohn 2005;
McConnell
2006) or use
case points
(Wiegers 2006)
,d. function
points (Jones
1996b; IFPUG
2010)
e. the number,
type, and
complexity of
user interface
elements
, Which of c
following is
NOT true for
customer
involvement
during the
project
lifecycle?
Select one:
a. On agile
projects,
customers (or a
product owner
who represents
them) are
engaged
continuously
throughout the
project.
b. On waterfall
projects,
customers
typically
dedicate
considerable
time up front
ACTUAL Exam Questions and
CORRECT Answers
Save
Terms in this set (47)
,How about a,b,c,d,e
estimating
project size and
effort from
requirements?
Based on
Select one or
more:
a. the number
of individually
testable
requirements
(Wilson 1995)
b. estimated
lines of code
needed to
implement
specific
requirements
c. story points
(Cohn 2005;
McConnell
2006) or use
case points
(Wiegers 2006)
,d. function
points (Jones
1996b; IFPUG
2010)
e. the number,
type, and
complexity of
user interface
elements
, Which of c
following is
NOT true for
customer
involvement
during the
project
lifecycle?
Select one:
a. On agile
projects,
customers (or a
product owner
who represents
them) are
engaged
continuously
throughout the
project.
b. On waterfall
projects,
customers
typically
dedicate
considerable
time up front