ARE 5.0 NCARB UPDATED
ACTUAL Exam Questions and
CORRECT Answers
Save
Terms in this set (54)
,Which of the Public
following
methods of
bidding is
required on
most projects
for which
government
funds are to be
used?
A. Direct
B. Negotiated
C. Invited
D. Public
,Which of the Fast track
following
project delivery
methods always
requires
preparation of
several
individual bid-
document
packages?
A. Design-Bid-
Build
B. Fast Track
C. Design Build
D. Turnkey
diagram on Specifications
paper
, In developing a recommend qualified contractors
list of bidders
for a private
project, the
architect's role
is to
A. select the
contractor
B. recommend
qualified
contractors
C. rank the
contractors in
order of
preference
D. discourage
owner-
recommended
contractors
ACTUAL Exam Questions and
CORRECT Answers
Save
Terms in this set (54)
,Which of the Public
following
methods of
bidding is
required on
most projects
for which
government
funds are to be
used?
A. Direct
B. Negotiated
C. Invited
D. Public
,Which of the Fast track
following
project delivery
methods always
requires
preparation of
several
individual bid-
document
packages?
A. Design-Bid-
Build
B. Fast Track
C. Design Build
D. Turnkey
diagram on Specifications
paper
, In developing a recommend qualified contractors
list of bidders
for a private
project, the
architect's role
is to
A. select the
contractor
B. recommend
qualified
contractors
C. rank the
contractors in
order of
preference
D. discourage
owner-
recommended