• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

RWP Definitions Study Exam Questions & Answers.

Document preview thumbnail
Preview 1 out of 4 pages

RWP Definitions Study Exam Questions & Answers. Adjacent tracks - CORRECT ANSWER Two or more tracks with track centers spaced less than 25 feet apart. Adjacent Track (As used in 336) - CORRECT ANSWER A controlled or non-controlled track whose track center is spaced less than 25 feet from the track center of the occupied track. Control Operator (Train dispatcher, train director, block operator, etc.) - CORRECT ANSWER The railroad employee in charge of remotely controlled switch or derail, an interlocking, a controlled point, or a segment of controlled track. Controlled track - CORRECT ANSWER a track upon which all movements will be authorized by a Control operator (dispatcher) Effective securing device - CORRECT ANSWER A vandal and tamper resistant lock, keyed for application and removal only by railroad workers Employee in Charge (EIC) - CORRECT ANSWER Employee in charge of a work group under the overarching authority of the Roadway Worker in Charge. Exclusive Track Occupancy - CORRECT ANSWER A method of establishing working limits on controlled track in which movement authority of trains and other equipment is withheld by the control operator or restricted by the flagman. Flagman - CORRECT ANSWER When used in relation with roadway worker safety, an employee designated by the railroad to direct or restrict the movement of trains past a point on a track to provide on-track safety for tat function. Not a gang watchman or advanced gang watchman. Foul Time - CORRECT ANSWER A method of establishing working limits on a controlled track in which a roadway worked is notified by the control operator that no trains will operate within a specific segment of controlled track until the roadway worker reports clear of the track.

Content preview

RWP Definitions Study Exam Questions
& Answers.
Adjacent tracks - CORRECT ANSWER Two or more tracks with track centers spaced less than 25 feet
apart.



Adjacent Track (As used in 336) - CORRECT ANSWER A controlled or non-controlled track whose track
center is spaced less than 25 feet from the track center of the occupied track.



Control Operator (Train dispatcher, train director, block operator, etc.) - CORRECT ANSWER The railroad
employee in charge of remotely controlled switch or derail, an interlocking, a controlled point, or a
segment of controlled track.



Controlled track - CORRECT ANSWER a track upon which all movements will be authorized by a Control
operator (dispatcher)



Effective securing device - CORRECT ANSWER A vandal and tamper resistant lock, keyed for application
and removal only by railroad workers



Employee in Charge (EIC) - CORRECT ANSWER Employee in charge of a work group under the
overarching authority of the Roadway Worker in Charge.



Exclusive Track Occupancy - CORRECT ANSWER A method of establishing working limits on controlled
track in which movement authority of trains and other equipment is withheld by the control operator or
restricted by the flagman.



Flagman - CORRECT ANSWER When used in relation with roadway worker safety, an employee
designated by the railroad to direct or restrict the movement of trains past a point on a track to provide
on-track safety for tat function. Not a gang watchman or advanced gang watchman.



Foul Time - CORRECT ANSWER A method of establishing working limits on a controlled track in which a
roadway worked is notified by the control operator that no trains will operate within a specific segment
of controlled track until the roadway worker reports clear of the track.

Document information

Uploaded on
June 27, 2025
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ROSEGRADES
3.4
(35)
Sold
236
Followers
87
Items
12121
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions