Cornerstone Fundamental Principles CORRECT ANSWERS Integrity
Objectivity
Confidentiality
Competence
Professionalism

When was Phase II established and when did permits begin? CORRECT ANSWERS
Established in 1999 and permits began in 2003.

6 Minimum control measures and what are they for? CORRECT ANSWERS SWMPs
(Stormwater management programs)
-Public Outreach
-Public involvement and participation
-Illicit Discharge Detection and elimination
-Construction stormwater runoff control
-Post Construction stormwater management in new development and redevelopment
-Pollution prevention and good housekeeping

What is the Federal Water Pollution Control act and when was it first established?
CORRECT ANSWERS Framework for CWA established in 1948. It was amended in
1972 to become the CWA.

Purpose of NPDES CORRECT ANSWERS to control discharges of pollutants from
point sources

What is POTW? CORRECT ANSWERS POTW (Publicly owned treatment works)

What is NURP and what did it discover? CORRECT ANSWERS National Urban Runoff
Program (1978-1983) characterized stormwater from residential, commercial, and light
industrial areas. It discovered common pollutants of concern in theses areas.

Section 402 CORRECT ANSWERS 5 categories that produce significant stormwater
pollution
1. Facilities already covered under an NPDES permit
2. Facilities with industrial activity
3. Large MS4 Systems (>250k pop)
4. Medium MS4 systems (100k<pop<250k)
5. Facilities EPA already determines as contributors to poor water quality

Section 404 CORRECT ANSWERS Outlines Dredge/Fill permitting

, CZARA CORRECT ANSWERS Coastal Sone Act Reauthorization Amendments - Every
state with coastal zone jurisdiction must develop a non-point pollution control plan to
address pollution not from point sources.

Stormwater Discharges definition CORRECT ANSWERS Any discernible confined, and
discrete conveyance, including but not limited to, any pipe, ditch, channel, tunnel,
conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding
operation, landfill leachate collection system, vessel or other floating craft from which
pollutants are or may be discharged.

Waters of the US (6 items) CORRECT ANSWERS -Waters that are, have been, or
could be used for commerce and waters subject to ebb and flow
-Interstate waters and wetlands
-Intrastate bodies of water
-Tributaries to the waters of the US
-Territorial Sea
Wetlands adjacent to any Waters of the US

What are not considered waters of the US? CORRECT ANSWERS Waste treatment
systems such as treatment ponds or lagoons designed to meet requirements of the
CWA.

What construction activities are subject to NPDES permitting? CORRECT ANSWERS
Disturbing >5 acres (Phase I) or between 1 and 5 acres (Phase II). Or if construction
uses heavy equipment and disturbs land and is considered to have serious impacts on
surrounding water quality.

Who is responsible for applying for the permit? CORRECT ANSWERS Operator of the
construction site. (Note: owner may apply if operator not identified, but once identified
must become copermittees or sole permittees)

Phase II CORRECT ANSWERS -covers commercial, retail, light industrial and
institutional facilities
-construction under 5 acres
-municipal MS4 systems with fewer than 100k population.

What is exempt from Phase II? CORRECT ANSWERS -Oil and Gas Operators
-Silviculture
-Agriculture (for crop production only)

Requirements of Phase II? CORRECT ANSWERS 1. Submittal of NOI
2. Development of SWPPP with appropriate BMPs.
3. Submittal of NOT when site is present.

When can waivers of issued for Phase II construction? CORRECT ANSWERS -Low
predicted rainfall (rainfall erosivity factor is less than 5, from RUSLE), OR

Document information

Uploaded on
June 24, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ElevatedExcellence
3.8
(178)
Sold
942
Followers
505
Items
18329
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions