ARE 5.0 (PjM/ PcM/ PA/ PPD/ PDD/ CE): Project Budget/ Financial UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 3 out of 20 pages

ARE 5.0 (PjM/ PcM/ PA/ PPD/ PDD/ CE): Project Budget/ Financial UPDATED ACTUAL Exam Questions and CORRECT Answers Pro Forma - CORRECT ANSWER - Projected financial statements of future values: expected project generated income vs. expected project building costs. - Developed in order to determine whether the project is likely to be financially successful. Bldg. cost factor - CORRECT ANSWER - *Quality* - *Construction Cost* - - *Scope (Project size)

Content preview

ARE 5.0 (PjM/ PcM/ PA/ PPD/ PDD/ CE):
Project Budget/ Financial UPDATED
ACTUAL Exam Questions and CORRECT
Answers
Pro Forma - CORRECT ANSWER - Projected financial statements of future values:
expected project generated income vs. expected project building costs.
- Developed in order to determine whether the project is likely to be financially successful.


Bldg. cost factor - CORRECT ANSWER - - *Scope (Project size)*
- *Quality*
- *Construction Cost*


Bldg. cost variable factors? - CORRECT ANSWER - - *Quality*: quality level of
materials/ systems/ construction
- Quantity
- Funds
- Time
- Location (urban/ rural): labor rates/ material prices/ transportation
(One cannot be changed without changing one or more of the others)


Scope vs. Cost - CORRECT ANSWER - - Perimeter-to-floor area = increase unit cost
- Floor-to-floor height = increase unit cost
- Taller bldg. = increase unit cost


Cost vs. Time - CORRECT ANSWER - *Labor cost = 50% of construction cost*
- Longer schedule = increase construction/ labor cost
- Higher Labor cost = decrease Productivity

,Method:
- shorten schedule: fast-track
- Increase off-site manufacturing = decrease on-site labor cost/ erection time


Quality vs. Life cycle - CORRECT ANSWER - - Higher quality = higher initial cost =
higher efficient = longer life span
- Longer life span = lower operational cost = decrease maintenance/ replacement cost


(Architect sets) Project Budget based on _________ - CORRECT ANSWER - *Scope*
Most realistic and accurate way to establish a preliminary budget, because it is based on a
specific building type of a defined size on a specific site.


Project Budget (Cost analysis) - CORRECT ANSWER - The *sum* established by the
owner as available for the entire project on *hard cost & soft cost*
- *Influence design decision & project feasibility*


Project Budget items - CORRECT ANSWER - *Hard cost (A to F)*
(A) Building Costs: Area x $cost/ GSF
(B) Fixed Equipment: 5-30% of A
(C) Site Development: 5-30% of A
(D) *Total Construction (A+B+C) = Base Bid*
(E) Land Acquisition: per project
(F) Movable Equipment: 5-20% of A


*Soft cost (G to J)*
(G) Professional Fees: 5-10% of D
(H) Contingencies: 5-15% of D
(J) Administrative Fees: 1-2% of D

, Hard Costs - CORRECT ANSWER - Expenses directly associated with construction,
including materials, labor and contractors overhead and profit.


What's included in hard cost? - CORRECT ANSWER - Hard cost expenses:
(A) *Bldg. cost*: GC's fee (overhead, profit)
(B) *Fixed Equipment*
(C) *Site development*: Demo, sitework, parking, landscape
(D) *Construction cost* (A+B+C): *Base Bid*
(E) *Land acquisition*: land purchase cost
(F) *Movable Equipment*


Soft Costs - CORRECT ANSWER - Other project expenses such as *design fees, legal
fees, financing cost of the project, insurance, administrative costs* incurred by the owner and
moving expenses.


What's included in soft cost? - CORRECT ANSWER - Soft cost expenses:
(G) *Professional services*: A/E design fees, Inspection & Testings
(H) *Contingency allowances *: unforeseen, error & emissions
(J) *Administrative Fees*: Insurance & bond/ Permit/ Development impact fee/ Financing cost
(debt service/ escalation estimate)/ Moving expenses


Building Cost - CORRECT ANSWER - *All costs of construction within 5' of building
line*
- *Bldg. construction cost*: structure, exterior cladding, finishes, materials, MEP systems
- *GC fees*: Overhead (General + Project) + Profit


General Overhead - CORRECT ANSWER - *Office related costs*
- Business insurance/ wages/ rent/ office supplies/ legal expenses/ recurring/ advertising

Document information

Uploaded on
June 24, 2025
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions